Installation
• Apply | • Move the next unit section as |
ribbed butyl tape to the shipping | close as possible from the |
split channel and shipping split | previous section. The two |
plates (see Figure 11). | sections should be close enough |
• Verify the section is level prior to | to reduce the amount of |
|
proceeding with the next section | dragging required. This is | |||
particularly important when | ||||
of the unit. | ||||
mounting on a roof curb to | ||||
|
|
| ||
|
|
| minimize damage to the sealant | |
|
|
| on the roof curb. Alignment of | |
|
|
| sections must be completed | |
|
|
| before drawing sections | |
|
|
| together. | |
|
|
| • Remove the bottom bolts from | |
|
|
| the shipping split lifting lugs (see | |
|
|
| Figure 12). | |
Figure 11. Apply butyl tape to shipping splits | ||||
|
|
|
|
18