fasteners and bracing specified or approved by the rack manufacturer or by industry standards. Refer to the two-post open-frame relay rack manufacturer’s installation documentation for precautionary warnings and information before attempting this installation.

CAUTION: Do not attempt to install the PowerApp system into a two-post open-frame relay rack that has not been securely anchored in place. Dam- age to the system and personal injury may result.

See “Safety Instructions” found earlier in this guide for additional safety information regarding rack installation.

Rack Kit Contents

The two-post flush-mount rack kit includes the following items (see Figure 4):

Two flush-mount brackets

Two inner mounting rails

Four 12-24 x 0.5-inch pan-head Phillips (or slotted) screws

Four 10-24 x 0.25-inch flat-head slotted screws for securing the inner mounting rails to the sides of the system

One 1-U template

support.dell.com

Dell PowerApp 100 Appliances Rack Installation Guide

5

Page 5
Image 5
Windster 100 manual Rack Kit Contents