inner mounting rails (2)

flush-mount brackets (2)

1-U template

10-24 x 0.25 inch flat- head Phillips screws (4)

12-24 x 0.5-inch pan- head Phillips screws (4)

Figure 4. Two-Post Flush-Mount Rack Kit Contents

Recommended Tools and Supplies

You need the following tools and supplies to install the system in a two-post open- frame relay rack:

#2 Phillips screwdriver

Masking tape or a felt-tip pen, for use in marking the mounting holes to be used

Marking the Rack

1.Determine where you want to place the bottom of the PowerApp 100 system.

CAUTION: If you are installing more than one PowerApp 100 system, install the first system in the lowest available position in the rack.

6 Dell PowerApp 100 Appliances Rack Installation Guide

Page 6
Image 6
Windster 100 manual Two-Post Flush-Mount Rack Kit Contents