WMF Americas 1400 Button Allocation, Weigh Grounds, Boiler Temperature, Reset, Clock and Date

Models: 1400

1 64
Download 64 pages 23.21 Kb
Page 29
Image 29
Button Allocation

Software

Quality 1 After pressing the coffee, grounds are given time to expand.

Quality 2 After pressing coffee is immediately brewed.

Quality 3 After pressing a pre-infusion follows.

Quality 4 After pressing and pre-infusion a second wet pressing follows.

Quality 5 After pressing a pre-infusion follows. In addition the brew time is automatically extended.

Attention!

Excessively high quality setting may lead to a brew water error.

Button Allocation

Each beverage is allocated to a beverage button.

This button allocation is set here.

Weigh Grounds

The Weigh Grounds process dispenses ground coffee directly into the grounds container. The grounds may then be weighed.

Empty grounds container prior to this procedure!

Boiler Temperature

Set desired boiler temperature.

 

(Change brewing water temperature).

 

Boiler temp.

(Setting range 94° - 99° C)

 

Reset

Coffee machine software is restarted.

Clock and Date

Clock time and date are set here.

Language

Language used in the display is set here.

User Manual WMF presto

Reset

Clock / Date

Language

29

Page 29
Image 29
WMF Americas 1400 Button Allocation, Weigh Grounds, Boiler Temperature, Reset, Clock and Date, Language, Software