Woods Equipment DS1260Q, DSO1260Q, DS1440Q Dealer Service, Crossbar Installation, Crossbar Timing

Models: DS1260Q DS1440 DS1440Q DS1260 DSO1260 DSO1260Q

1 86
Download 86 pages 59.27 Kb
Page 35
Image 35
Crossbar Installation

Crossbar Installation

1.Using emery cloth (220 or finer), remove surface rust, and foreign material from hub, splined gearbox vertical shaft, and crossbar. See Figure 19.

Figure 19. Typical Crossbar and Gearbox Shaft

2.Install crossbar (2) on splined shaft. See Figure 20. Install nut (3). Torque nut to 450 lbs-ft. Install cotter pin.

Figure 20. Crossbar Installation

Crossbar Timing

Crossbar must be re-timed anytime a crossbar or a side drive is disconnected.

1.To re-time crossbars, position bars as shown in Figure 21.

2.The right crossbar will be at right angles to the front of the cutter.

3.Measure from the front of the cutter to the blade pin on left crossbar.

4.Hold crossbars in position while connecting the side drivelines.

Figure 21. Crossbar Timing - Bottom View

MAN0571 (Rev. 6/15/2007)

Dealer Service 35

 

 

Page 35
Image 35
Woods Equipment DS1260Q, DSO1260Q, DS1440Q manual Dealer Service, Crossbar Installation, Crossbar Timing