Manuals / Brands / Computer Equipment / Power Supply / Xantrex Technology / Computer Equipment / Power Supply

Xantrex Technology ACCB 1 Installation

1 66
Download 66 pages, 2 Mb

1 Installation

Chapter 1, “Installation” provides installation and wiring instructions for the Sine Wave Plus AC Conduit Box (ACCB).

The following topics are covered in this chapter.

For this topic:

See:

 

 

“Introduction”

page 1–2

“Specifications”

page 1–3

“Bypass Switch Assembly”

page 1–4

“Code Compliance”

page 1–5

“Installation Tools and Materials”

page 1–5

“Wiring Scenarios”

page 1–6

“Pre-installation”

page 1–7

“Mounting the ACCB to the Inverter”

page 1–14

“Pre-Wiring Preparation”

page 1–15

“Off-Grid Wiring”

page 1–18

 

through

 

page 1–29

“On-Grid Wiring”

page 1–30

 

through

 

page 1–37

“Wiring for Dual Inverter Configurations”

page 1–39

 

 

Contents
Page Page Installation Guide Page About This Guide Page Important Safety Instructions Page Contents Page Figures Page 1 Installation Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page 2 Operating the ACCB Page Page Page Warranty and Product Information Page Page Page Index