Installation
Wiring Scenarios
Wiring scenarios will depend upon the configuration of the overall system (i.e., Off Grid or On Grid). Pre-installation and mounting instructions apply to all configurations. Follow the instructions from page 1–7to page 1–17for all installations.
After the pre-installation procedures have been completed, select the wiring scenario that applies to your configuration. Once you have completed the wiring instructions for your specific application, proceed to the Operation section.
Off-Grid Applications
The following Off-Grid scenarios are covered in this guide:
•Off-Grid Applications using an AC distribution panel (sub-panel) and an external generator disconnect switch.
See page 1–18for wiring instructions for this application.
•Off-Grid Applications using an additional circuit breaker in the ACCB for a generator disconnect.
See page 1–22for wiring instructions for this application.
•Off-Grid Applications using additional circuit breakers in the ACCB for AC loads and a generator disconnect.
See page 1–26for wiring instructions for this application.
On-Grid Applications
The following On-Grid scenarios are covered in this guide:
•On-Grid Applications with generator backup using an AC Distribution Panel and an additional circuit breaker in the ACCB for a generator disconnect.
See page 1–30for wiring instructions for this application.
•On-Grid Applications using additional circuit breakers in the ACCB for AC distribution (i.e., no sub panel).
See page 1–34for wiring instructions for this application.