Pre-installation

Pre-installation

WARNING

Ensure that no DC voltage is being supplied to the inverter and that no AC voltage is present on the AC wiring. Failure to do so could cause serious injury or death.

Location

Be sure to allow sufficient space for the ACCB to be mounted directly adjacent to the inverter’s AC side. Also consider the additional weight and ventilation space requirements of the ACCB.

Ventilation Requirements

Minimum clearance for ventilation around ACCB must be at least

6 inches (152 mm) at the end and at the top. The minimum clearance is needed to prevent recirculating hot air from the inverter’s exhaust (DC side) from going back into the inverter’s intake (AC side).

For maximum ventilation, 12 inches (305 mm) is recommended around the top.

Please refer to the Sine Wave Plus Inverter/Charger Owner’s Guide for additional location considerations.

12" (305 mm)

6" (152 mm)

Recommended

Minimum Required

 

 

6" (152 mm) Minimum Required

SetInve ter

OFF SRCH ON CHG

AC Conduit Box

Sine Wave Plus Inverter / Charger

ON

O N

D

OFFOFF

Figure 1-4Clearance Requirements for Ventilation

975-0046-01-01

1–7