Section 4: Inverter/Charger Installation

This section describes the tools and materials required, the appropriate location and environment for mounting the inverter/charger, AC and DC cabling, and step-by-step instructions to install the unit. A number of diagrams for various types of installations are provided. These instructions are intended to be used as a guide only. It is the installer’s responsibility to observe all safety and appropriate installation regulations and to proceed accordingly.

Read the entire chapter first before commencing the installation to ensure you have all the materials necessary to install the PS2.5/3.0 and that is is being installed in an appropriate environment.

WARNING: FIRE, SHOCK, AND ENERGY HAZARD Installation should be performed by certified and experienced technicians familiar with inverter/charger installations and the applicable installation codes.

Governing installation codes will vary depending upon the specific location and application of the inverter/charger installation. Installations may be governed by the Code of Federal Regulations (CFRs), the American Boat and Yacht Council, (ABYC), National Electrical Code (NEC), Canadian Standards Association (CSA), Canadian Electrical Code (CEC), RV Industry Association (RVIA) or others. For complete and authoritative installation regulations contact the appropriate regulatory agency.

Safety Instructions

Before beginning the installation of the Prosine inverter/charger, review the safety instructions at the beginning of this manual, and read this entire section. Disconnect all sources of AC and DC power to prevent accidental shock. Disable and secure all AC and DC disconnect devices and automatic generator starting devices. Use the DIP switches to configure the inverter/charger after reading ”Section 3: Configuration” page 25. If you have the ACS Control panel, you can configure the unit after installation, but before operating.

Installation Overview

Experienced and licensed installers familiar with inverter/charger installations may follow the steps listed below to install the Prosine 2.5/3.0 inverter/charger. For system component recommendations and requirements, refer to each specific section in this manual. For instance, the ”AC Cabling” section describes AC wiring guidelines, while the ”DC Cabling” section describes DC wiring guidelines.

This is an overview only. If you are unsure of any aspect of inverter/charger installation, read the entire manual, cover to cover, before attempting to perform an installation.

1.Before beginning any installation, disconnect all sources of power, both AC and DC.

2.Remove the Prosine inverter/charger from the shipping container and verify that all components are present. Record the model and serial number on the packaging page of this manual.

3.Slide the BYPASS/ON switch on the side of the Prosine inverter/charger to BYPASS.

Prosine Installation & Operation Guide

37