Zebra Technologies P330i, P330m user manual Take-up Spool Flange Supply Spool

Models: P330m P330i

1 68
Download 68 pages 48.28 Kb
Page 24
Image 24
Take-up

Installation and Setup

Loading a Ribbon

b.Raise the Print Head Carriage by pressing the release latch to the left (toward the output hopper) and lifting as shown below to about a 45° angle. The Print Head Carriage will stay in that position, as shown at the right below.

Ribbon Take-up

Ribbon Supply

Spindle

Spindle

3.Locate the Ribbon Supply Spindle and the Ribbon Take-up Spindle (see above). Load ribbon onto the supply spindle (under the print head carriage) flange side in, and load the empty core (with tape attached) onto the take-up spindle. Make sure the ribbon comes off the top of the supply spindle and feeds to the top of the take-up spindle.

Take-up

Spool

Flange

Manual background Supply Spool

12

P330i & P330m Card Printer User’s Manual

980459-001 Rev C

Page 24
Image 24
Zebra Technologies P330i, P330m user manual Take-up Spool Flange Supply Spool