Raypak 992B-1262B manual On-Off Wiring Connections

Page 24

DANGER: SHOCK HAZARD

Make sure electrical power to the heater is discon- nected to avoid potential serious injury or damage to components.

Fig. 21: On-Off Wiring Connections

Fig. 22: 2-Stage Wiring Connections

Fig. 23: 3-Stage Wiring Connections

Fig. 24: 4-Stage Wiring Connection

Installer action is required to electrically enable your heater to operate after making the power connections. You must make a closed contact connection on Stage 1 connector of the Central Point Wiring (CPW) board for temperature control connections. This will be done based on the controller option selected with your heater order.

1.For Pool and Closed-Loop Water-Source Heat Pump applications, your heater should be config-

24

Image 24
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Before Installation Installations at ElevationProduct Receipt Model IdentificationComponent Locations Component Locations BackGeneral Information Model Quantity Vent Size Gas Burners BlowersValves Model Burners per Valve Stages Fire at StageGeneral Safety Time/Temperature Relationships in ScaldsWater Time to Produce Serious Temp Burn Installation Installation CodesEquipment Base StackingTable D Vent/Air Inlet Termination Clearances Indoor Installations Outdoor InstallationsClearances Combustion and Ventilation Air Indoor UnitsReversing Air Filter Direct VentInstallations Conventional Combustion Air SupplyTruSeal Combustion Air All Air from Inside the BuildingCanadian Installations Water PipingGeneral Reversing Water ConnectionsRelief Valve Piping Hydrostatic Test Cold Water OperationTemperature & Pressure Gauge Hydronic HeatingPump Selection Pressure Drop in Feet of Head Feedwater Regulator PipingAir-Separation/Expansion Tank Three-Way ValvesPotable Water and Space Heating Pool HeatingAutomatic Chlorinators and Chemical Feeders Winterizing Your HeaterGas Supply Pool/Spa Water Chemistry Water HardnessPH of Water Total Dissolved SolidsGas Supply Connection Reversing Gas Supply ConnectionModel Table I Maximum Equivalent Pipe LengthElectrical Power Connections Check the Power SourceGas Supply Pressure Field-Connected ControllersField Wiring Connection Making the Electrical ConnectionsOn-Off Wiring Connections Venting Flue Exhaust TeeModel Diameter Order Number Appliance CategoriesSupport of Vent Stack Vent Terminal LocationCombustion Exhaust Certified Combustion AirInstallations Canadian InstallationsChanging the Flue Outlet Venting Installation Tips Venting ConfigurationsInstallation Natural Draft Vertical Venting CategoryTermination Common Venting SystemCertified Vertical Venting Combustion Air Air Inlet Model HeightHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryDirect Vent Horizontal Through- the-Wall Model Certified Maximum Combustion Air InletVenting Equivalent Material Vent Length Intake PipeDirect Vent Vertical Direct Vent VerticalOutdoor Installation ControlsFreeze Protection Heater Sequence of Operation Models 992B-1262BExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page High Limit Manual Reset Flow SwitchIgnition Module Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalUDB Diagnostic Board UDB Fault History87%-Efficiency Boilers Special Instructions Water PipingVenting Appliance Categories Vertical Venting Category Vent Terminal LocationCondensate Management Certified Maximum Combustion Air Air Inlet Model Venting EquivalentMax. Length Material Vent Length Direct Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram Models 992B-1262B Wiring Diagram Models 1532B-2342B START-UP Pre Start-upBlower Adjustment Main Burner AdjustmentStart-Up Safety Inspection Leak Test Procedure Dual-Seat Gas ValvesFollow-Up Pilot Turn-Down TestPost Start-Up Check Leak TestOperation Lighting InstructionsTo Turn Off Gas To Appliance Troubleshooting StepMaintenance Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule Weekly Semi-AnnuallyAnnually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page