Raypak 992B-1262B manual Component Locations Back

Page 6

Component Locations

OPTIONAL FLUE

CONNECTION

Fig. 1: Component Locations – Back

Fig. 2: Component Locations – Left Side

Panels removed for clarity

Fig. 3: Component Locations – Front

6

Image 6
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Product Receipt Before InstallationInstallations at Elevation Model IdentificationComponent Locations Component Locations BackValves General InformationModel Quantity Vent Size Gas Burners Blowers Model Burners per Valve Stages Fire at StageGeneral Safety Time/Temperature Relationships in ScaldsWater Time to Produce Serious Temp Burn Equipment Base InstallationInstallation Codes StackingTable D Vent/Air Inlet Termination Clearances Indoor Installations Outdoor InstallationsClearances Reversing Air Filter Combustion and Ventilation AirIndoor Units Direct VentTruSeal Combustion Air InstallationsConventional Combustion Air Supply All Air from Inside the BuildingGeneral Canadian InstallationsWater Piping Reversing Water ConnectionsRelief Valve Piping Hydrostatic Test Cold Water OperationTemperature & Pressure Gauge Hydronic HeatingPump Selection Air-Separation/Expansion Tank Pressure Drop in Feet of Head Feedwater RegulatorPiping Three-Way ValvesPotable Water and Space Heating Pool HeatingAutomatic Chlorinators and Chemical Feeders Winterizing Your HeaterPH of Water Gas SupplyPool/Spa Water Chemistry Water Hardness Total Dissolved SolidsModel Gas Supply ConnectionReversing Gas Supply Connection Table I Maximum Equivalent Pipe LengthGas Supply Pressure Electrical Power ConnectionsCheck the Power Source Field-Connected ControllersField Wiring Connection Making the Electrical ConnectionsOn-Off Wiring Connections Model Diameter Order Number VentingFlue Exhaust Tee Appliance CategoriesCombustion Exhaust Support of Vent StackVent Terminal Location Certified Combustion AirInstallations Canadian InstallationsChanging the Flue Outlet Installation Venting Installation TipsVenting Configurations Natural Draft Vertical Venting CategoryCertified Vertical Venting Combustion Air Air Inlet Model TerminationCommon Venting System HeightHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryVenting Direct Vent Horizontal Through- the-WallModel Certified Maximum Combustion Air Inlet Equivalent Material Vent Length Intake PipeDirect Vent Vertical Direct Vent VerticalOutdoor Installation ControlsFreeze Protection Heater Sequence of Operation Models 992B-1262BExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page Ignition Module High Limit Manual ResetFlow Switch Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalUDB Diagnostic Board UDB Fault History87%-Efficiency Boilers Special Instructions Water PipingVenting Appliance Categories Vertical Venting Category Vent Terminal LocationCondensate Management Certified Maximum Combustion Air Air Inlet Model Venting EquivalentMax. Length Material Vent Length Direct Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram Models 992B-1262B Wiring Diagram Models 1532B-2342B START-UP Pre Start-upBlower Adjustment Main Burner AdjustmentStart-Up Follow-Up Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Pilot Turn-Down TestPost Start-Up Check Leak TestOperation Lighting InstructionsTo Turn Off Gas To Appliance Troubleshooting StepMaintenance Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule Annually WeeklySemi-Annually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page