Safety Inspection

1.Check all thermostats and high limit settings.

2.During the following safety checks leave manome- ters hooked up, check and record.

3.If other gas-fired appliances in the room are on the same gas main, check all pressures on the Hi Delta with all other equipment running.

4.Check thermostats for ON-OFF operation.

5.Check high limits for ON-OFF operation.

6.While in operation, check flow switch operation.

7.Check the low gas pressure switch. (For proper adjustment, use the attached manometers, if available, to set pressure. The scales on the switch are approximate only.) Low gas pressure switch must be set at 5.0 in. WC for natural gas and 10.0 in. WC for propane gas.

8.Make sure that the high gas pressure switch (op- tional) is set to 1.0 in. WC above manifold pres-sure.

Follow-Up

Safety checks must be recorded as performed.

Turn heater on. After main burner ignition:

1.Check manometer for proper reading.

2.Cycle heater several times and re-check readings.

3.Remove all manometers and replace caps and screws.

4.Replace all gas pressure caps.

5.Check for gas leaks one more time.

Pilot Turn-Down Test

The Hi Delta heaters, depending on their size, have two to five burner sections. Each burner section is sup- plied gas by gas valves incorporated into a single valve body. A maximum of three burner sections may be controlled by a single hot surface ignition system. The middle of the three burner sections is ignited directly with a hot surface ignition system.

The burner section that is ignited directly by the hot surface ignition system serves as a supervised pilot to light the burner sections on either side of it. The burn- er sections on either side of the supervised section (pilot) are electrically interlocked with the supervised ignition system so as they are not energized unless flame is proven on the center section which is acting as a pilot to light the right and left-hand sections.

The pilot turn-down test is conducted as follows:

1.Turn off manual valves on non-supervised burner sections.

2.Turn on electrical power and adjust thermostat to call for heat.

3.Wait for completion of ignition sequence to light burner section being utilized as a pilot for those turned off in step 1 above.

4.Gradually reduce manifold pressure (flame) on supervised burner section by slowly closing man- ual gas valve. Watch for shut-down due to loss of supervised flame signal as pressure is being re- duced. Flame signal should be lost before manifold pressure goes below 2.0 in. WC for nat- ural gas and 6.0 in. WC for propane gas.

Leak Test Procedure: Dual-Seat Gas Valves

Proper leak testing requires three pressure test points in the gas train.

Test point A is upstream of the automatic gas valve. On the first automatic valve, this is a bleedle valve. On the other valves, this is a plugged port. The bleedle valve on the first valve may be used for all the other valves as well.

Test point B is a bleedle valve located between the two automatic gas valve seats.

Test point C is located downstream of both automatic gas valve seats and upstream of the manual valve. On the manual valve, this is a bleedle valve. Identical readings will be found at the plugged port labeled as Alternate C.

Refer to Fig. 45. The numbers on the diagram refer to the steps below:

These tests are to be conducted with the electrical power to the heater turned off.

54

Image 54
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Product Receipt Before InstallationInstallations at Elevation Model IdentificationComponent Locations Component Locations BackValves General InformationModel Quantity Vent Size Gas Burners Blowers Model Burners per Valve Stages Fire at StageGeneral Safety Time/Temperature Relationships in ScaldsWater Time to Produce Serious Temp Burn Equipment Base InstallationInstallation Codes StackingTable D Vent/Air Inlet Termination Clearances Indoor Installations Outdoor InstallationsClearances Reversing Air Filter Combustion and Ventilation AirIndoor Units Direct VentTruSeal Combustion Air InstallationsConventional Combustion Air Supply All Air from Inside the BuildingGeneral Canadian InstallationsWater Piping Reversing Water ConnectionsRelief Valve Piping Hydrostatic Test Cold Water OperationTemperature & Pressure Gauge Hydronic HeatingPump Selection Air-Separation/Expansion Tank Pressure Drop in Feet of Head Feedwater RegulatorPiping Three-Way ValvesPotable Water and Space Heating Pool HeatingAutomatic Chlorinators and Chemical Feeders Winterizing Your HeaterPH of Water Gas SupplyPool/Spa Water Chemistry Water Hardness Total Dissolved SolidsModel Gas Supply ConnectionReversing Gas Supply Connection Table I Maximum Equivalent Pipe LengthGas Supply Pressure Electrical Power ConnectionsCheck the Power Source Field-Connected ControllersField Wiring Connection Making the Electrical ConnectionsOn-Off Wiring Connections Model Diameter Order Number VentingFlue Exhaust Tee Appliance CategoriesCombustion Exhaust Support of Vent StackVent Terminal Location Certified Combustion AirInstallations Canadian InstallationsChanging the Flue Outlet Installation Venting Installation TipsVenting Configurations Natural Draft Vertical Venting CategoryCertified Vertical Venting Combustion Air Air Inlet Model TerminationCommon Venting System HeightHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryVenting Direct Vent Horizontal Through- the-WallModel Certified Maximum Combustion Air Inlet Equivalent Material Vent Length Intake PipeDirect Vent Vertical Direct Vent VerticalOutdoor Installation ControlsFreeze Protection Heater Sequence of Operation Models 992B-1262BExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page Ignition Module High Limit Manual ResetFlow Switch Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalUDB Diagnostic Board UDB Fault History87%-Efficiency Boilers Special Instructions Water PipingVenting Appliance Categories Vertical Venting Category Vent Terminal LocationCondensate Management Certified Maximum Combustion Air Air Inlet Model Venting EquivalentMax. Length Material Vent Length Direct Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram Models 992B-1262B Wiring Diagram Models 1532B-2342B START-UP Pre Start-upBlower Adjustment Main Burner AdjustmentStart-Up Follow-Up Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Pilot Turn-Down TestPost Start-Up Check Leak TestOperation Lighting InstructionsTo Turn Off Gas To Appliance Troubleshooting StepMaintenance Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule Annually WeeklySemi-Annually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page