Raypak 992B-1262B Combustion and Ventilation Air, Indoor Units, Reversing Air Filter, Direct Vent

Page 12

Fig. 8: Minimum Clearances from Combustible

Surfaces – Outdoor Installations

Combustion and Ventilation Air

NOTE: Use of the heater in construction areas where fine particulate matter, such as concrete or dry-wall dust, is present may result in damage to the heater that is not covered by the warranty. If operated in a construction environment, a clean source of combustion air must be provided directly to the heater.

Indoor Units

The heater must be supplied with sufficient quantities of non-contaminated air to support proper combustion and equipment ventilation. Combustion air can be sup- plied via conventional means where combustion air is drawn from the area immediately surrounding the heater, or via direct vent, where combustion air is drawn directly from outside. All installations must com- ply with the requirements of the NFGC (U.S.) and B149 (Canada), and all local codes.

CAUTION: Combustion air must not be contaminated by corrosive chemical fumes which can damage the heater and void the warranty. (See the Appendix.)

NOTE: It is recommended that the intake vent be insulated to minimize sweating.

Reversing Air Filter

Follow these instructions to change the air duct con- nection from the left-hand side (standard) to the right-hand side:

1.Remove the four screws and the dust cover from the right-hand side of the heater.

2.Remove the four screws and the air filter bracket from the left-hand side of the heater.

3.Reverse the components and reattach in the new location, making sure that the air filter locking bracket is on the bottom. (The air filter locking bracket is reversible.)

Direct Vent

If outside air is drawn through the intake pipe directly to the unit for combustion:

1.Install combustion air direct vent in accordance with Fig. 29 (horizontal) or Fig. 30 (vertical) of this manual (pages 31 and 32, respectively).

2.Provide adequate ventilation of the space occu- pied by the heater(s) by an opening(s) for ventilation air at the highest practical point com- municating with the outdoors. The total cross-sectional area shall be at least 1 in.2 of free area per 20,000 BTUH (111 mm2 per kW) of total input rating of all equipment in the room when the opening is communicating directly with the out- doors or through vertical duct(s). The total cross-sectional area shall be at least 1 in.2 of free area per 10,000 BTUH (222 mm2 per kW) of total input rating of all equipment in the room when the opening is communicating with the outdoors through horizontal duct(s).

3.In cold climates, and to mitigate potential freeze- up, Raypak highly recommends the installation of a motorized sealed damper to prevent the circula- tion of cold air through the heater during the non-operating hours.

Direct-Ducted Combustion Air

In certain applications it may be desirable to duct the combustion air directly to the heater. This should be done with PVC, CPVC or single-wall galvanized duct- ing. The duct will attach directly to the collar on the air filter housing located on the side of the heater. The ducting is attached to the air filter housing collar using

12

Image 12
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Before Installation Installations at ElevationProduct Receipt Model IdentificationComponent Locations Component Locations BackGeneral Information Model Quantity Vent Size Gas Burners BlowersValves Model Burners per Valve Stages Fire at StageGeneral Safety Time/Temperature Relationships in ScaldsWater Time to Produce Serious Temp Burn Installation Installation CodesEquipment Base StackingTable D Vent/Air Inlet Termination Clearances Indoor Installations Outdoor InstallationsClearances Combustion and Ventilation Air Indoor UnitsReversing Air Filter Direct VentInstallations Conventional Combustion Air SupplyTruSeal Combustion Air All Air from Inside the BuildingCanadian Installations Water PipingGeneral Reversing Water ConnectionsRelief Valve Piping Hydrostatic Test Cold Water OperationTemperature & Pressure Gauge Hydronic HeatingPump Selection Pressure Drop in Feet of Head Feedwater Regulator PipingAir-Separation/Expansion Tank Three-Way ValvesPotable Water and Space Heating Pool HeatingAutomatic Chlorinators and Chemical Feeders Winterizing Your HeaterGas Supply Pool/Spa Water Chemistry Water HardnessPH of Water Total Dissolved SolidsGas Supply Connection Reversing Gas Supply ConnectionModel Table I Maximum Equivalent Pipe LengthElectrical Power Connections Check the Power SourceGas Supply Pressure Field-Connected ControllersField Wiring Connection Making the Electrical ConnectionsOn-Off Wiring Connections Venting Flue Exhaust TeeModel Diameter Order Number Appliance CategoriesSupport of Vent Stack Vent Terminal LocationCombustion Exhaust Certified Combustion AirInstallations Canadian InstallationsChanging the Flue Outlet Venting Installation Tips Venting ConfigurationsInstallation Natural Draft Vertical Venting CategoryTermination Common Venting SystemCertified Vertical Venting Combustion Air Air Inlet Model HeightHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryDirect Vent Horizontal Through- the-Wall Model Certified Maximum Combustion Air InletVenting Equivalent Material Vent Length Intake PipeDirect Vent Vertical Direct Vent VerticalOutdoor Installation ControlsFreeze Protection Heater Sequence of Operation Models 992B-1262BExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page High Limit Manual Reset Flow SwitchIgnition Module Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalUDB Diagnostic Board UDB Fault History87%-Efficiency Boilers Special Instructions Water PipingVenting Appliance Categories Vertical Venting Category Vent Terminal LocationCondensate Management Certified Maximum Combustion Air Air Inlet Model Venting EquivalentMax. Length Material Vent Length Direct Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram Models 992B-1262B Wiring Diagram Models 1532B-2342B START-UP Pre Start-upBlower Adjustment Main Burner AdjustmentStart-Up Safety Inspection Leak Test Procedure Dual-Seat Gas ValvesFollow-Up Pilot Turn-Down TestPost Start-Up Check Leak TestOperation Lighting InstructionsTo Turn Off Gas To Appliance Troubleshooting StepMaintenance Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule Weekly Semi-AnnuallyAnnually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page