Raypak 992B-1262B manual Weekly, Semi-Annually, As Required

Page 59

Weekly

For low-pressure heaters, test low-water cut-off device. (With at least one stage of the appliance on, depress the low water cut-off test button, appliance should shut-off and ignition fault light should come on. Depress reset button to reset).

Monthly

1.Check flue, vent, stack, or outlet dampers.

2.Test fan air pressure. (See “Blower Adjustment” on page 51.)

3.Test high and low gas pressure interlocks (if equipped). (See “Safety Inspection” on page 52.)

Semi-Annually

1.Recalibrate all indicating and recording gauges.

2.Check flame failure detection system components. (See “Pilot Turn-Down Test Procedure,” page 52.)

3.Check firing rate control by checking the manifold pressure. (See “Main Burner Adjustment” on page 51.)

4.Check piping and wiring of all interlocks and shut- off valves.

Annually

1.Test flame failure detection system and pilot turn- down. (See “Pilot Turn-Down Test Procedure,” page 52.)

2.Test high limit and operating temperature. (See “Post Start-Up Check,” page 53.)

3.Check flame sensors.

4.Conduct a combustion test at full fire. Carbon di- oxide should be 7.5 to 8.5% at full fire for natural gas, and between 9.2 to 9.8% for propane gas; Carbon monoxide should be < 150 ppm).

5.Check coils for 60 cycle hum or buzz. Check for leaks at all valve fittings using a soapy water solu- tion. Test other operating parts of all safety shut-off and control valves and increase or decrease set- tings (depending on the type of control) until the safety circuit opens. Reset to original setting after each device is tested.

6.Perform leakage test on gas valves. (See Fig. 45.)

7.Test air switch in accordance with manufacturer’s instructions. (Turn panel switch to the “On” posi- tion until blower is proven, then turn the switch to “Off”.

8.Inspect and clean burners as necessary.

As Required

1.Recondition or replace low water cut-off device (if equipped).

2.Check drip leg and gas strainers.

3.Perform flame failure detection and pilot turn- down tests.

4.Check igniter. (Resistance reading should be 42- 70 ohms at ambient temperature.)

5.Check flame signal strength. (Flame signal should be greater than 1 microamp).

6.Test safety/safety relief valves in accordance with ASME Heater and Pressure Vessel Code Sections VI and VII.

59

Image 59
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Model Identification Before InstallationInstallations at Elevation Product ReceiptComponent Locations Back Component LocationsModel Burners per Valve Stages Fire at Stage General InformationModel Quantity Vent Size Gas Burners Blowers ValvesWater Time to Produce Serious Temp Burn General SafetyTime/Temperature Relationships in Scalds Stacking InstallationInstallation Codes Equipment BaseTable D Vent/Air Inlet Termination Clearances Clearances Indoor InstallationsOutdoor Installations Direct Vent Combustion and Ventilation AirIndoor Units Reversing Air FilterAll Air from Inside the Building InstallationsConventional Combustion Air Supply TruSeal Combustion AirReversing Water Connections Canadian InstallationsWater Piping GeneralCold Water Operation Relief Valve Piping Hydrostatic TestPump Selection Temperature & Pressure GaugeHydronic Heating Three-Way Valves Pressure Drop in Feet of Head Feedwater RegulatorPiping Air-Separation/Expansion TankPool Heating Potable Water and Space HeatingWinterizing Your Heater Automatic Chlorinators and Chemical FeedersTotal Dissolved Solids Gas SupplyPool/Spa Water Chemistry Water Hardness PH of WaterTable I Maximum Equivalent Pipe Length Gas Supply ConnectionReversing Gas Supply Connection ModelField-Connected Controllers Electrical Power ConnectionsCheck the Power Source Gas Supply PressureMaking the Electrical Connections Field Wiring ConnectionOn-Off Wiring Connections Appliance Categories VentingFlue Exhaust Tee Model Diameter Order NumberCertified Combustion Air Support of Vent StackVent Terminal Location Combustion ExhaustChanging the Flue Outlet InstallationsCanadian Installations Natural Draft Vertical Venting Category Venting Installation TipsVenting Configurations InstallationHeight TerminationCommon Venting System Certified Vertical Venting Combustion Air Air Inlet ModelHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryEquivalent Material Vent Length Intake Pipe Direct Vent Horizontal Through- the-WallModel Certified Maximum Combustion Air Inlet VentingDirect Vent Vertical Direct Vent VerticalFreeze Protection Outdoor InstallationControls Models 992B-1262B Heater Sequence of OperationExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page Operating Control High Limit Manual ResetFlow Switch Ignition ModuleLow Water Cut-Off Optional High and Low Gas Pressure SwitchesUDB Fault History UDB Diagnostic BoardVenting Appliance Categories 87%-Efficiency Boilers Special InstructionsWater Piping Condensate Management Vertical Venting CategoryVent Terminal Location Max. Length Material Vent Length Certified Maximum Combustion Air Air Inlet Model VentingEquivalent Direct Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram Models 992B-1262B Wiring Diagram Models 1532B-2342B Pre Start-up START-UPStart-Up Blower AdjustmentMain Burner Adjustment Pilot Turn-Down Test Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Follow-UpLeak Test Post Start-Up CheckTo Turn Off Gas To Appliance OperationLighting Instructions Step TroubleshootingPreventive Maintenance Schedule MaintenanceSuggested Minimum Maintenance Schedule As Required WeeklySemi-Annually AnnuallyInside Air Contamination AppendixLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page