Raypak 992B-1262B manual Before Installation, Product Receipt, Model Identification

Page 5

BEFORE INSTALLATION

Raypak strongly recommends that this manual be re- viewed thoroughly before installing your Hi Delta heater. Please review the General Safety information before installing the heater. Factory warranty does not apply to heaters that have been improperly installed or operated. (Refer to the warranty at the back of this manual.) Installation and service must be performed by a qualified installer, service agency or gas supplier. If, after reviewing this manual, you still have questions which this manual does not answer, please contact the manufacturer or your local Raypak representative.

Thank you for purchasing a Raypak product. We hope you will be satisfied with the high quality and durability of our equipment.

Product Receipt

On receipt of your heater it is suggested that you visu- ally check for external damage to the shipping crate. If the crate is damaged, make a note to that effect on the Bill of Lading when signing for the shipment. Remove the heater from the shipping packaging. Report any damage to the carrier immediately.

On occasion, items are shipped loose. Be sure that you receive the correct number of packages as indi- cated on the Bill of Lading.

Claims for shortages and damages must be filed with the carrier by consignee. Permission to return goods must be received from the factory prior to shipping. Goods returned to the factory without an authorized Returned Goods Receipt number will not be accepted. All returned goods are subject to a restocking charge.

When ordering parts, you must specify the model and serial number of the heater. When ordering under war- ranty conditions, you must also specify the date of installation.

Purchased parts are subject to replacement only under the manufacturer’s warranty. Debits for defec- tive replacement parts will not be accepted and will be replaced in kind only per Raypak’s standard war- ranties.

Model Identification

The model identification number and heater serial number are found on the heater rating plate located on the lower right outside jacket of the heater. The model

number will have the form H9 1262B or similar depending on the heater size and configuration. The letter(s) in the first group of characters identifies the application (H = Hydronic Heating, WH = Domestic Hot Water (DHW), P = Pool). The number which fol- lows identifies the firing mode (1 or 4 = on-off, 3 = 2-stage, 8 = 3-stage and 9 = 4-stage). The second group of characters identifies the size of the heater (four numbers representing the approximate MBTUH input), and, where applicable, a letter, indicating the manufacturing series. An “E” suffix indicates 87% effi- ciency (Category II or IV venting) (“H” stamped boilers only).

Ratings and Certifications

Standards:

ANSI Z21.13 · CSA 4.9 - latest edition, Gas-Fired Hot Water Boilers

CAN 3.1 - latest edition, Industrial and Commercial Gas-Fired Package Boilers

ANSI Z21.56 · CSA 4.7 - latest edition Gas-Fired Pool Heaters

ANSI Z21.10.3 · CSA 4.3 - latest edition Gas Water Heaters

All Raypak heaters are National Board Approved, and design-certified and tested by the Canadian Standards Association (CSA) for the U.S. and Canada. Each heater is constructed in accordance with Section IV of the American Society of Mechanical Engineers (ASME) Heater Pressure Vessel Code and bears the ASME stamp. The heater also complies with the latest edition of ASHRAE 90.1 Standard.

WARNING: Altering any Raypak pressure vessel by installing replacement heat exchangers, tube bundle headers, or any ASME parts not manufactured and/or approved by Raypak will instantly void the ASME and CSA ratings of the vessel and any Raypak warranty on the vessel. Altering the ASME or CSA ratings of the vessel also violates national, state, and local approval codes.

Installations at Elevation

Rated inputs are suitable for up to 5,000 ft elevation without de-rating. Consult the factory for installations at altitudes over 5,000 ft above sea level.

5

Image 5
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Installations at Elevation Before InstallationProduct Receipt Model IdentificationComponent Locations Back Component LocationsModel Quantity Vent Size Gas Burners Blowers General InformationValves Model Burners per Valve Stages Fire at StageWater Time to Produce Serious Temp Burn General SafetyTime/Temperature Relationships in Scalds Installation Codes InstallationEquipment Base StackingTable D Vent/Air Inlet Termination Clearances Clearances Indoor InstallationsOutdoor Installations Indoor Units Combustion and Ventilation AirReversing Air Filter Direct VentConventional Combustion Air Supply InstallationsTruSeal Combustion Air All Air from Inside the BuildingWater Piping Canadian InstallationsGeneral Reversing Water ConnectionsCold Water Operation Relief Valve Piping Hydrostatic TestPump Selection Temperature & Pressure GaugeHydronic Heating Piping Pressure Drop in Feet of Head Feedwater RegulatorAir-Separation/Expansion Tank Three-Way ValvesPool Heating Potable Water and Space HeatingWinterizing Your Heater Automatic Chlorinators and Chemical FeedersPool/Spa Water Chemistry Water Hardness Gas SupplyPH of Water Total Dissolved SolidsReversing Gas Supply Connection Gas Supply ConnectionModel Table I Maximum Equivalent Pipe LengthCheck the Power Source Electrical Power ConnectionsGas Supply Pressure Field-Connected ControllersMaking the Electrical Connections Field Wiring ConnectionOn-Off Wiring Connections Flue Exhaust Tee VentingModel Diameter Order Number Appliance CategoriesVent Terminal Location Support of Vent StackCombustion Exhaust Certified Combustion AirChanging the Flue Outlet InstallationsCanadian Installations Venting Configurations Venting Installation TipsInstallation Natural Draft Vertical Venting CategoryCommon Venting System TerminationCertified Vertical Venting Combustion Air Air Inlet Model HeightHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryModel Certified Maximum Combustion Air Inlet Direct Vent Horizontal Through- the-WallVenting Equivalent Material Vent Length Intake PipeDirect Vent Vertical Direct Vent VerticalFreeze Protection Outdoor InstallationControls Models 992B-1262B Heater Sequence of OperationExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page Flow Switch High Limit Manual ResetIgnition Module Operating ControlLow Water Cut-Off Optional High and Low Gas Pressure SwitchesUDB Fault History UDB Diagnostic BoardVenting Appliance Categories 87%-Efficiency Boilers Special InstructionsWater Piping Condensate Management Vertical Venting CategoryVent Terminal Location Max. Length Material Vent Length Certified Maximum Combustion Air Air Inlet Model VentingEquivalent Direct Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram Models 992B-1262B Wiring Diagram Models 1532B-2342B Pre Start-up START-UPStart-Up Blower AdjustmentMain Burner Adjustment Leak Test Procedure Dual-Seat Gas Valves Safety InspectionFollow-Up Pilot Turn-Down TestLeak Test Post Start-Up CheckTo Turn Off Gas To Appliance OperationLighting Instructions Step TroubleshootingPreventive Maintenance Schedule MaintenanceSuggested Minimum Maintenance Schedule Semi-Annually WeeklyAnnually As RequiredInside Air Contamination AppendixLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page