Raypak 992B-1262B manual Wiring Diagram Models 1532B-2342B

Page 51

Wiring Diagram - Models 1532B-2342B

51

Image 51
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Model Identification Before InstallationInstallations at Elevation Product ReceiptComponent Locations Back Component LocationsModel Burners per Valve Stages Fire at Stage General InformationModel Quantity Vent Size Gas Burners Blowers ValvesGeneral Safety Time/Temperature Relationships in ScaldsWater Time to Produce Serious Temp Burn Stacking InstallationInstallation Codes Equipment BaseTable D Vent/Air Inlet Termination Clearances Indoor Installations Outdoor InstallationsClearances Direct Vent Combustion and Ventilation AirIndoor Units Reversing Air FilterAll Air from Inside the Building InstallationsConventional Combustion Air Supply TruSeal Combustion AirReversing Water Connections Canadian InstallationsWater Piping GeneralCold Water Operation Relief Valve Piping Hydrostatic TestTemperature & Pressure Gauge Hydronic HeatingPump Selection Three-Way Valves Pressure Drop in Feet of Head Feedwater RegulatorPiping Air-Separation/Expansion TankPool Heating Potable Water and Space HeatingWinterizing Your Heater Automatic Chlorinators and Chemical FeedersTotal Dissolved Solids Gas SupplyPool/Spa Water Chemistry Water Hardness PH of WaterTable I Maximum Equivalent Pipe Length Gas Supply ConnectionReversing Gas Supply Connection ModelField-Connected Controllers Electrical Power ConnectionsCheck the Power Source Gas Supply PressureMaking the Electrical Connections Field Wiring ConnectionOn-Off Wiring Connections Appliance Categories VentingFlue Exhaust Tee Model Diameter Order NumberCertified Combustion Air Support of Vent StackVent Terminal Location Combustion ExhaustInstallations Canadian InstallationsChanging the Flue Outlet Natural Draft Vertical Venting Category Venting Installation TipsVenting Configurations InstallationHeight TerminationCommon Venting System Certified Vertical Venting Combustion Air Air Inlet ModelHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryEquivalent Material Vent Length Intake Pipe Direct Vent Horizontal Through- the-WallModel Certified Maximum Combustion Air Inlet VentingDirect Vent Vertical Direct Vent VerticalOutdoor Installation ControlsFreeze Protection Models 992B-1262B Heater Sequence of OperationExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page Operating Control High Limit Manual ResetFlow Switch Ignition ModuleLow Water Cut-Off Optional High and Low Gas Pressure SwitchesUDB Fault History UDB Diagnostic Board87%-Efficiency Boilers Special Instructions Water PipingVenting Appliance Categories Vertical Venting Category Vent Terminal LocationCondensate Management Certified Maximum Combustion Air Air Inlet Model Venting EquivalentMax. Length Material Vent Length Direct Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram Models 992B-1262B Wiring Diagram Models 1532B-2342B Pre Start-up START-UPBlower Adjustment Main Burner AdjustmentStart-Up Pilot Turn-Down Test Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Follow-UpLeak Test Post Start-Up CheckOperation Lighting InstructionsTo Turn Off Gas To Appliance Step TroubleshootingMaintenance Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule As Required WeeklySemi-Annually AnnuallyInside Air Contamination AppendixLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page