Servis-Rhino RC-12 manual Assembly Section

Page 37

ASSEMBLY SECTION

Assembly Section 3-1

© 2005 Alamo Group Inc.

Image 37
Contents RC-12 To the Owner/Operator/Dealer Warranty InformationTable of Contents Maintenance Section Safety Section Safety Wait a minute...Save a life Safety Equipment Operation Safety Instructions and Practices Stop Mowing if Passersby are Within 100 Yards Unless Safety Safety RC12 Safety Section STI-3 Safety MPH. STI-6 Maintenance and Service Safety Instructions and Practices Parts Information Concluding Safety Instructions and Practices Reflect PeligroInstruct Logo NFS SER PLTName ModelDecal Description Has stopped. P/N RC12 Safety Section Safety Safety Safety Safety Safety Safety Federal Laws and Regulations Introduction Section Introduction Before Operating this Machine Owners Responsibilities Safety Instructions Page Assembly Section Tongue Assembly Installation Breather Plug InstallationShipping Stand Removal Assembly Asm-FL-0066 Point Hitch Assembly Installation Attaching Optional Hydraulic Cylinder Attaching Axle Assemblies to Main Wheel BAR TubeOperation Section Operation CAT II-III Q.H OperationPersonal Protective Equipment PPE Operator RequirementsTractor Requirements and Capabilities Tractor Safety DevicesRops and Seat Belt Power Take Off PTO Front End Weight3-Point Hitch Drawbar-Pull Type MowerBoarding the Tractor Getting on and OFF the TractorDismounting the Tractor Starting the Tractor Connecting the Mower to the TractorPull Type Models Setting the MowerLift Type Models Semi-Mount ModelsOperation Leveling Deck Driveline AttachmentDriveline Clearance Engagement Check Procedure PRE-OPERATION Inspection and ServiceShorten the driveline profiles as follows Mower Pre-Operation Inspection/Service Tractor Pre-Operation Inspection/ServiceSGM-10 Operation Driving the Tractor and Implement Starting the Tractor Raising the Mower Brake and Differential Lock SettingDriving the Tractor and Mower Turning ProcedureCrossing Ditches and Steep Inclines Operating the Tractor and Implement Operation Foreign Debris Hazards Bystanders/Passersby PrecautionsEngaging the Power Take Off PTO Operating the Mower PTO RPM and Ground SpeedOperation Shutting Down the Implement OPS-F-0012A Disconnecting the Mower from the TractorTransporting the Tractor and Implement Mower StorageOperation Transporting on Public Roadways OPS-U Hauling the Tractor and Implement Problem Possible Cause Remedy Trouble Shooting GuidePTO RPM Page Maintenance Section Lubrication General MaintenanceRoutine Maintenance Belt Adjustment and Replacement Blade ReplacementCutter Shaft Pulley Alignment and Removal Maintenance Cutter Shaft and Bearing Removal InstallationCutter Shaft Bearing Removal Mnt-FL-0041 Outer Cutter Shaft Bearing RemovalCutter Shaft Removal TOP Drive Assembly ServicingDriveline Driveline Shield ReplacementMnt-FL-0032 Figure Mnt-FL-0036 Pre-season Check Storing the RC12Rhino Required of the Operator Required of the OwnerRC12 12/05 00726339C Printed U.S.A