Servis-Rhino RC-12 manual Shutting Down the Implement

Page 71

OPERATION

10.6 Shutting Down the Implement

To shut down the implement, first bring the tractor to a complete stop. Then slow down the implement by reducing the engine speed before disengaging the PTO. Wait for all motion to stop before proceeding to drive or shut down the tractor.

Park the tractor on a level surface, place the transmission in park or neutral and apply the parking brake, lower the attached implement to the ground, shut down the engine, remove the key, and wait for all motion to come to a complete stop before exiting the tractor. OPS-F- 0011

RC12 12/05

Operation Section 4-29

© 2005 Alamo Group Inc.

OPERATION

Image 71
Contents RC-12 To the Owner/Operator/Dealer Warranty InformationTable of Contents Maintenance Section Safety Section Safety Wait a minute...Save a life Safety Equipment Operation Safety Instructions and Practices Stop Mowing if Passersby are Within 100 Yards Unless Safety Safety RC12 Safety Section STI-3 Safety MPH. STI-6 Maintenance and Service Safety Instructions and Practices Parts Information Concluding Safety Instructions and Practices Instruct PeligroReflect Model NFS SER PLTLogo NameDecal Description Has stopped. P/N RC12 Safety Section Safety Safety Safety Safety Safety Safety Federal Laws and Regulations Introduction Section Introduction Before Operating this Machine Owners Responsibilities Safety Instructions Page Assembly Section Shipping Stand Removal Breather Plug InstallationTongue Assembly Installation Assembly Asm-FL-0066 Point Hitch Assembly Installation Attaching Optional Hydraulic Cylinder Attaching Axle Assemblies to Main Wheel BAR TubeOperation Section Operation CAT II-III Q.H OperationPersonal Protective Equipment PPE Operator RequirementsRops and Seat Belt Tractor Safety DevicesTractor Requirements and Capabilities Drawbar-Pull Type Mower Front End WeightPower Take Off PTO 3-Point HitchBoarding the Tractor Getting on and OFF the TractorDismounting the Tractor Starting the Tractor Connecting the Mower to the TractorSemi-Mount Models Setting the MowerPull Type Models Lift Type ModelsOperation Leveling Deck Driveline AttachmentDriveline Clearance Shorten the driveline profiles as follows PRE-OPERATION Inspection and ServiceEngagement Check Procedure Mower Pre-Operation Inspection/Service Tractor Pre-Operation Inspection/ServiceSGM-10 Operation Driving the Tractor and Implement Starting the Tractor Raising the Mower Brake and Differential Lock SettingDriving the Tractor and Mower Turning ProcedureCrossing Ditches and Steep Inclines Operating the Tractor and Implement Operation Foreign Debris Hazards Bystanders/Passersby PrecautionsEngaging the Power Take Off PTO Operating the Mower PTO RPM and Ground SpeedOperation Shutting Down the Implement OPS-F-0012A Disconnecting the Mower from the TractorTransporting the Tractor and Implement Mower StorageOperation Transporting on Public Roadways OPS-U Hauling the Tractor and Implement Problem Possible Cause Remedy Trouble Shooting GuidePTO RPM Page Maintenance Section Lubrication General MaintenanceRoutine Maintenance Cutter Shaft Blade ReplacementBelt Adjustment and Replacement Pulley Alignment and Removal Maintenance Outer Cutter Shaft Bearing Removal InstallationCutter Shaft and Bearing Removal Cutter Shaft Bearing Removal Mnt-FL-0041Cutter Shaft Removal TOP Drive Assembly ServicingMnt-FL-0032 Driveline Shield ReplacementDriveline Figure Mnt-FL-0036 Pre-season Check Storing the RC12Rhino Required of the Operator Required of the OwnerRC12 12/05 00726339C Printed U.S.A