Servis-Rhino RC-12 manual Shipping Stand Removal, Breather Plug Installation

Page 38

ASSEMBLY

ASSEMBLY

The RC Flail Shredders are supplied with a Cat III 3-Point Hitch on lift-type models or a tongue hitch assembly on pull-type models.

SHIPPING STAND REMOVAL

Use overhead hoist to lower machine from shipping position. Use a 5000 pound capacity hoist.

Support mower with hoist at lifting points. Remove outer shipping stands at both ends of machine.

Lower machine and rest on endplate extension skids.

Remove center shipping bracket. Use hoist to lift. Pins are required to attach tongue or 3-point hitch.

BREATHER PLUG INSTALLATION

Remove pipe plug from top of gear box and install breather plug. Breather plug is attached to jack mount tube on topside of mower deck.

Remove level plug at rear of gearbox and check lubricant level is at base of plug. NOTE: Use only Moly- Lube 203 90wt. (Rhino p/n 00724177) or equivalent.

TONGUE ASSEMBLY INSTALLATION

(Pull Type Models Only)

Tongue attaches with four pins between hitch ears on front of mower. Use pins which attach center ship- ping bracket.

Use hoist to raise hitch into position. Attach lower pivot point first with 1-7/16" pins. Raise front of hitch with hoist to attach 1" top pins. Fasten in place with snapper pins. The tongue assembly has two height posi- tions, for normal operation pin tongue in top hole, for additional crop clearance pin tongue in second hole set. Clean and apply anti-seize compound to gearbox input shaft.

Remove eccentric lock collar on jack shaft bearing (item 1) by loosening set screw, inserting a drift pin in blind hole on lock collar and tapping clockwise to loosen. Slide jackshaft (item 2) and yoke assembly (item 3) forward through bearing to attach spline yoke assembly to gearbox. Slide 1-3/4" 27-spline yoke and shaft assembly on gearbox input shaft. Yoke will only fit on shaft in one position. Align bolt hole on yoke shaft. Insert bolt (item 4), lockwasher (item 5), and tighten nut (item 6). Asm-FL-0064 (see on following page)

Place lock collar on shaft, move in position on extended race of jack shaft bearing and rotate by hand in direction of shaft rotation until eccentrics are positively engaged. Insert drift pin in blind hole and lock tightly in direction of shaft rotation with the aid of a hammer. Tighten 3/8" set screws (item 7) on lock collar to 19 ft. lbs. Asm-FL-0064.

Note: Loosen lock collar before adjusting tongue position.

Check that the torque on bearing mount bolts ( item 8 ) is 85 ft. lbs. Asm-FL-0064.

RC12 12-05

Assembly Section 3-2

© 2005 Alamo Group Inc.

Image 38
Contents RC-12 Warranty Information To the Owner/Operator/DealerTable of Contents Maintenance Section Safety Section Safety Wait a minute...Save a life Safety Equipment Operation Safety Instructions and Practices Stop Mowing if Passersby are Within 100 Yards Unless Safety Safety RC12 Safety Section STI-3 Safety MPH. STI-6 Maintenance and Service Safety Instructions and Practices Parts Information Concluding Safety Instructions and Practices Instruct PeligroReflect Name NFS SER PLTLogo ModelDecal Description Has stopped. P/N RC12 Safety Section Safety Safety Safety Safety Safety Safety Federal Laws and Regulations Introduction Section Introduction Before Operating this Machine Owners Responsibilities Safety Instructions Page Assembly Section Shipping Stand Removal Breather Plug InstallationTongue Assembly Installation Assembly Asm-FL-0066 Point Hitch Assembly Installation Attaching Axle Assemblies to Main Wheel BAR Tube Attaching Optional Hydraulic CylinderOperation Section Operation Operation CAT II-III Q.HOperator Requirements Personal Protective Equipment PPERops and Seat Belt Tractor Safety DevicesTractor Requirements and Capabilities 3-Point Hitch Front End WeightPower Take Off PTO Drawbar-Pull Type MowerGetting on and OFF the Tractor Boarding the TractorDismounting the Tractor Connecting the Mower to the Tractor Starting the TractorLift Type Models Setting the MowerPull Type Models Semi-Mount ModelsOperation Driveline Attachment Leveling DeckDriveline Clearance Shorten the driveline profiles as follows PRE-OPERATION Inspection and ServiceEngagement Check Procedure Tractor Pre-Operation Inspection/Service Mower Pre-Operation Inspection/ServiceSGM-10 Operation Driving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Raising the MowerTurning Procedure Driving the Tractor and MowerCrossing Ditches and Steep Inclines Operating the Tractor and Implement Operation Bystanders/Passersby Precautions Foreign Debris HazardsEngaging the Power Take Off PTO PTO RPM and Ground Speed Operating the MowerOperation Shutting Down the Implement Disconnecting the Mower from the Tractor OPS-F-0012AMower Storage Transporting the Tractor and ImplementOperation Transporting on Public Roadways OPS-U Hauling the Tractor and Implement Trouble Shooting Guide Problem Possible Cause RemedyPTO RPM Page Maintenance Section General Maintenance LubricationRoutine Maintenance Cutter Shaft Blade ReplacementBelt Adjustment and Replacement Pulley Alignment and Removal Maintenance Cutter Shaft Bearing Removal Mnt-FL-0041 InstallationCutter Shaft and Bearing Removal Outer Cutter Shaft Bearing RemovalTOP Drive Assembly Servicing Cutter Shaft RemovalMnt-FL-0032 Driveline Shield ReplacementDriveline Figure Mnt-FL-0036 Storing the RC12 Pre-season CheckRhino Required of the Owner Required of the OperatorRC12 12/05 00726339C Printed U.S.A