Xantrex Technology
PV100S-480
installation manual
Schematics
Specifications
Install
Schematics
Wiring Requirements
Dimension
Pots Access
Operational Safety Procedures
Safety
Communication Features
On/Off Switch
Page 77
A
Schematics
Appendix A contains useful schematics to aid with installation.
Page 76
Page 78
Image 77
Page 76
Page 78
Contents
PV100S 100 kW Grid-Tied Photovoltaic Inverter
Page
PV100S 100 kW Grid-Tied Photovoltaic Inverter
Date and Revision
Scope
Purpose
Audience
Organization
Following conventions are used in this guide
Conventions Used
Related Information
Abbreviations and Acronyms
Page
Important Safety Instructions
Personal Safety
General Safety Precautions
Safety Equipment
Wiring Requirements
Safety
Lockout and Tag
Operational Safety Procedures
To isolate the PV100S
De-Energize/Isolation Procedure
Interconnection Standards Compliance
Xii
Contents
Verification
Installation
Schematics
Tables
Xvi
Figures
Figures
Introduction
Description of the PV100S
1Dimensions Not to scale
Electrical Specifications
System Specifications
System Ground Requirements
3Environmental Specifications
Environmental Specifications
Operator Interface Controls
Main Enclosure Door Interlock Switch
3On/Off Switch
On/Off Switch
AC and DC Disconnect Switches
Communication Features
Data Logging
System Status and Fault Reporting
Universal Front Panel Control Unit Ufcu
Communication Methods
6PC Connections in the Communications Enclosure
PC Connection Methods
Pots Access
Ethernet LAN Access
Planning
Overview of PV100S Installation
PV Planning
Ventilation and Serviceability Requirements
System Neutral Requirements
Ground Requirements
Communication Requirements
Utility Side Isolation Transformer Requirements
Model PV100S-208
Electrical Diagrams and Schematics
Model PV100S-480
1PV100S Layout Option a
Layout Options
2PV100S Layout Option B
3Conduit Entry Figure Reference
Conduit Penetration
15 cm 12 30 cm
10.5 27 cm
Determine the required cable ampacity
Conductor and Conduit Sizing
To calculate the proper conduit size
Size the conduit
Size the cable
29 73.7 cm 16 ¼ 40.6 cm
Anchoring the PV100S
10AC Interface/Transformer Anchor Bolt Pattern Not to Scale
Installation
Unloading
Equipment Required
Unpacking the PV100S
Moving the PV100S
Removing the Pallet and Moving the PV100S
To move the PV100S using a forklift
To mount and anchor the PV100S
Mounting and Anchoring the Units
To lock or unlock the front door on the main inverter
Opening or Closing Access Doors
To Close Access Door
To Open Access Door
7Transformer Access Panels
To install the conduits
Conduit Installation
Wiring General
Conductor Termination
Overcurrent Protection
Grounding
Wire Gauge and Torque Requirements
Utility Side Isolation Transformer Requirements
System Neutral Requirements
AC Connections
Wiring Specific
13Tie-wraps on the AC Sense Harness
15AC Terminal Connections in the Main Inverter Enclosure
To connect the utility service to AC Interface Enclosure
17Connecting the AC Sense Harness
18AC Terminal Connections from the Utility
19PV Array Cable Routing and Terminations
PV Array Connections
PC Communications
Establishing a Pots Connection
To connect a personal computer using the Pots Connection
To connect a personal computer using the GSM Wireless modem
Establishing Wireless Connection
Direct Connection
If connecting the PC directly to the inverter
22Direct Connect Installation
Verification
Verification Procedure Summary
Visual Inspection of Electrical Connections
Visual Inspection of Mechanical Connections
Perform after initial inspection if required
Visual Inspection, Isolation Transformer Wye/Wye
Corrective Action
Schematics
This page intentionally left blank
Figure A-1Electrical Diagram sample
Schematics
Appendix a
Schematics
Appendix a
Schematics
Appendix a
This page was intentionally left blank
Index
IX-2 Rev C
Page
Xantrex Technology Inc
Related pages
All Diagram page
What are the safety precautions for the
Amcor air cleaner
?
Top
Page
Image
Contents