Xantrex Technology PV100S-480 Visual Inspection, Isolation Transformer Wye/Wye, Corrective Action

Page 76

Verification

Visual Inspection, Isolation Transformer Wye/Wye

To perform a visual inspection of the Isolation Transformer Wye/Wye:

1.

Ensure that the AC and DC Disconnect Switches, as well as any utility

 

Interconnect circuit breakers or main disconnect switches, are open.

 

2.

Verify all conductor and wiring connections interfacing with the

 

PV100S are tightened to the correct torque value.

 

 

For specific torque values, see Table 3-1, “AC Terminal Wire Gauge,

 

 

Bolt Size, and Torque Values” on page 3–12 and Table 3-2, “DC

 

 

Terminal Wire Gauge, Bolt Size, and Torque Values” on page 3–12.

 

3.

Verify the AC power conductors terminated at T6-X1, T6-X2, T6-X3

 

within the Transformer Enclosure are terminated correctly and properly

 

 

sequenced.

 

4.

Ensure the neutral on the inverter side (T6-X0) is left floating. If the

 

inverter side neutral is tied to ground, the inverter will not function

 

 

properly. Also, ensure that the neutral is not bonded to the isolation

 

 

transformer frame.

 

Date

Checks Completed

Corrective Action

Perform after initial inspection (if required):

1.Correct any necessary repairs pertaining to the previous inspection steps.

2.Replace the wiring access panels to the AC interface/transformer assembly and Main Inverter Enclosure.

3.Replace the latches and close the doors of the Main Inverter Enclosure, the AC and DC Interface Enclosures, and communication enclosure.

4.Ensure that the AC and DC Disconnect Switches, as well as any utility interconnect circuit breaker or main disconnect circuit breaker, are left open.

4–4

152315 Rev C

Image 76
Contents PV100S 100 kW Grid-Tied Photovoltaic Inverter Page PV100S 100 kW Grid-Tied Photovoltaic Inverter Date and Revision Purpose ScopeAudience OrganizationConventions Used Following conventions are used in this guideAbbreviations and Acronyms Related InformationPage Important Safety Instructions General Safety Precautions Personal SafetySafety Equipment Wiring RequirementsSafety Operational Safety Procedures Lockout and TagInterconnection Standards Compliance De-Energize/Isolation ProcedureTo isolate the PV100S Xii Contents Schematics InstallationVerification Tables Xvi Figures Figures Introduction Description of the PV100S 1Dimensions Not to scale System Specifications Electrical SpecificationsSystem Ground Requirements Environmental Specifications 3Environmental SpecificationsMain Enclosure Door Interlock Switch Operator Interface ControlsOn/Off Switch 3On/Off SwitchCommunication Features AC and DC Disconnect SwitchesSystem Status and Fault Reporting Data LoggingCommunication Methods Universal Front Panel Control Unit UfcuPC Connection Methods 6PC Connections in the Communications EnclosurePots Access Ethernet LAN Access Planning Overview of PV100S Installation Ventilation and Serviceability Requirements PV PlanningGround Requirements System Neutral RequirementsCommunication Requirements Utility Side Isolation Transformer RequirementsModel PV100S-480 Electrical Diagrams and SchematicsModel PV100S-208 Layout Options 1PV100S Layout Option a2PV100S Layout Option B Conduit Penetration 3Conduit Entry Figure Reference15 cm 12 30 cm 10.5 27 cm To calculate the proper conduit size Conductor and Conduit SizingDetermine the required cable ampacity Size the cable Size the conduitAnchoring the PV100S 29 73.7 cm 16 ¼ 40.6 cm10AC Interface/Transformer Anchor Bolt Pattern Not to Scale Installation Equipment Required UnloadingMoving the PV100S Unpacking the PV100STo move the PV100S using a forklift Removing the Pallet and Moving the PV100SMounting and Anchoring the Units To mount and anchor the PV100SOpening or Closing Access Doors To lock or unlock the front door on the main inverterTo Open Access Door To Close Access Door7Transformer Access Panels Conduit Installation To install the conduitsWiring General Overcurrent Protection Conductor TerminationWire Gauge and Torque Requirements GroundingSystem Neutral Requirements Utility Side Isolation Transformer RequirementsWiring Specific AC Connections13Tie-wraps on the AC Sense Harness 15AC Terminal Connections in the Main Inverter Enclosure 17Connecting the AC Sense Harness To connect the utility service to AC Interface Enclosure18AC Terminal Connections from the Utility PV Array Connections 19PV Array Cable Routing and TerminationsPC Communications To connect a personal computer using the Pots Connection Establishing a Pots ConnectionEstablishing Wireless Connection To connect a personal computer using the GSM Wireless modemIf connecting the PC directly to the inverter Direct Connection22Direct Connect Installation Verification Verification Procedure Summary Visual Inspection of Mechanical Connections Visual Inspection of Electrical ConnectionsCorrective Action Visual Inspection, Isolation Transformer Wye/WyePerform after initial inspection if required Schematics This page intentionally left blank Figure A-1Electrical Diagram sample Schematics Appendix a Schematics Appendix a Schematics Appendix a This page was intentionally left blank Index IX-2 Rev C Page Xantrex Technology Inc