Verification
Visual Inspection, Isolation Transformer Wye/Wye
To perform a visual inspection of the Isolation Transformer Wye/Wye:
1. | Ensure that the AC and DC Disconnect Switches, as well as any utility | ❐ |
| Interconnect circuit breakers or main disconnect switches, are open. |
|
2. | Verify all conductor and wiring connections interfacing with the | ❐ |
| PV100S are tightened to the correct torque value. |
|
| For specific torque values, see Table |
|
| Bolt Size, and Torque Values” on page |
|
| Terminal Wire Gauge, Bolt Size, and Torque Values” on page |
|
3. | Verify the AC power conductors terminated at | ❐ |
| within the Transformer Enclosure are terminated correctly and properly |
|
| sequenced. |
|
4. | Ensure the neutral on the inverter side | ❐ |
| inverter side neutral is tied to ground, the inverter will not function |
|
| properly. Also, ensure that the neutral is not bonded to the isolation |
|
| transformer frame. |
|
Date | Checks Completed |
Corrective Action
Perform after initial inspection (if required):
1.Correct any necessary repairs pertaining to the previous inspection steps.
2.Replace the wiring access panels to the AC interface/transformer assembly and Main Inverter Enclosure.
3.Replace the latches and close the doors of the Main Inverter Enclosure, the AC and DC Interface Enclosures, and communication enclosure.
4.Ensure that the AC and DC Disconnect Switches, as well as any utility interconnect circuit breaker or main disconnect circuit breaker, are left open.
152315 Rev C |