Xantrex Technology PV100S-480 installation manual Establishing a Pots Connection

Page 69

PC Communications

Establishing a POTS Connection

Important: A direct analog phone line to the local phone service is required to use this feature. The phone line used for PV100S communication cannot be routed through a Private Branch Exchange (PBX) unless an analog PBX card is used.

To connect a personal computer using the POTS Connection:

1.Ensure the personal computer to be used has a 56K modem installed.

2.Open the Communications Enclosure.

3.Plug the local phone line into the RJ11 port on the SA2 Surge Arrestor marked "UNPROTECTED".

SA2 Surge Arrestor

MultiTech 56K

Modem

Figure 3-20Telephone Cable Routing

4.Install the GUI Software following the instructions in the PV100S 100 kW Grid-tied Photovoltaic Inverter Operation and Maintenance Manual.

5.Use a Terminal Emulation program on the PC to access the modem.

See the GUI Help Menu "Communication by Modem" for instructions on setting up the Terminal Emulation program on the computer. See also, "Connect to Telephone Number" and "Connect to Remote Inverter by Modem" for additional information.

6.Use the GUI to setup the connection information.

a)From the GUI Main page, click on <TOOLS>

b)Click on the inverter icon for the inverter to be setup.

c)Click on the <INVERTER DATA>

d)Click on the <CONNECTION> tab.

e)Fill out the information required on the <GENERAL> page, the

<TELEPHONE FAULT CONFIGURATION> page, and the <TELEPHONE CONFIGURATION> page.

152315 Rev C

3–21

Image 69
Contents PV100S 100 kW Grid-Tied Photovoltaic Inverter Page PV100S 100 kW Grid-Tied Photovoltaic Inverter Date and Revision Scope PurposeAudience OrganizationFollowing conventions are used in this guide Conventions UsedRelated Information Abbreviations and AcronymsPage Important Safety Instructions Personal Safety General Safety PrecautionsSafety Equipment Wiring RequirementsSafety Lockout and Tag Operational Safety ProceduresDe-Energize/Isolation Procedure Interconnection Standards ComplianceTo isolate the PV100S Xii Contents Installation SchematicsVerification Tables Xvi Figures Figures Introduction Description of the PV100S 1Dimensions Not to scale Electrical Specifications System SpecificationsSystem Ground Requirements 3Environmental Specifications Environmental SpecificationsOperator Interface Controls Main Enclosure Door Interlock Switch3On/Off Switch On/Off SwitchAC and DC Disconnect Switches Communication FeaturesData Logging System Status and Fault ReportingUniversal Front Panel Control Unit Ufcu Communication Methods6PC Connections in the Communications Enclosure PC Connection MethodsPots Access Ethernet LAN Access Planning Overview of PV100S Installation PV Planning Ventilation and Serviceability RequirementsSystem Neutral Requirements Ground RequirementsCommunication Requirements Utility Side Isolation Transformer RequirementsElectrical Diagrams and Schematics Model PV100S-480Model PV100S-208 1PV100S Layout Option a Layout Options2PV100S Layout Option B 3Conduit Entry Figure Reference Conduit Penetration15 cm 12 30 cm 10.5 27 cm Conductor and Conduit Sizing To calculate the proper conduit sizeDetermine the required cable ampacity Size the conduit Size the cable29 73.7 cm 16 ¼ 40.6 cm Anchoring the PV100S10AC Interface/Transformer Anchor Bolt Pattern Not to Scale Installation Unloading Equipment RequiredUnpacking the PV100S Moving the PV100SRemoving the Pallet and Moving the PV100S To move the PV100S using a forkliftTo mount and anchor the PV100S Mounting and Anchoring the UnitsTo lock or unlock the front door on the main inverter Opening or Closing Access DoorsTo Close Access Door To Open Access Door7Transformer Access Panels To install the conduits Conduit InstallationWiring General Conductor Termination Overcurrent ProtectionGrounding Wire Gauge and Torque RequirementsUtility Side Isolation Transformer Requirements System Neutral RequirementsAC Connections Wiring Specific13Tie-wraps on the AC Sense Harness 15AC Terminal Connections in the Main Inverter Enclosure To connect the utility service to AC Interface Enclosure 17Connecting the AC Sense Harness18AC Terminal Connections from the Utility 19PV Array Cable Routing and Terminations PV Array ConnectionsPC Communications Establishing a Pots Connection To connect a personal computer using the Pots ConnectionTo connect a personal computer using the GSM Wireless modem Establishing Wireless ConnectionDirect Connection If connecting the PC directly to the inverter22Direct Connect Installation Verification Verification Procedure Summary Visual Inspection of Electrical Connections Visual Inspection of Mechanical ConnectionsVisual Inspection, Isolation Transformer Wye/Wye Corrective ActionPerform after initial inspection if required Schematics This page intentionally left blank Figure A-1Electrical Diagram sample Schematics Appendix a Schematics Appendix a Schematics Appendix a This page was intentionally left blank Index IX-2 Rev C Page Xantrex Technology Inc