Fujitsu Siemens Computers X103 SFF manual System expansions

Page 41

System expansions

2

1

1

2

Loosen the screws (1) and (2) of the hard disk.

Remove the hard disk carrier.

iIt may be necessary to modify the entry for the drive in the BIOS Setup.

Remove the new hard disk from the package.

Fasten the hard disk carrier to the new hard disk.

Fasten the screws (1) and (2).

Plug in the cables on the hard disk.

3

2

3

1

Place the hard drive mount into the casing so that it fastens onto the lug (1).

Slide the hard disk carrier in the direction of the arrow as far as it will go (2). Make sure that the screws on the underneath of the hard disk go into the holes in the base of the casing.

Fasten the two screws (3).

Install the drive cage (see "Installing the drive cage").

Close the casing (see "Closing the casing").

VFY-SCED103S, edition 1

33

Image 41
Contents Edition X103 SFF Are there Page Published by Operating Manual Edition X103 SFFPage Contents Contents Notational conventions Your Edition X103 SFFPage Cleaning the device Safety notesImportant notes Transporting the deviceCE marking for devices without radio component Energy saving, disposal and recyclingCE marking Preparing for use Steps for initial setupUnpacking and checking the delivery External devicesSetting up the device Vertical operating position Horizontal operating position with rubber feet Connect the monitor, mouse and keyboardConnecting a keyboard Connecting the monitorConnecting the mouse Initial switch-on Software will be installed Connecting the device to the mains voltageSwitching on monitor and device Connecting external devicesInstalling the software Connecting cablesPorts provided by the device Disconnecting cablesConnecting external devices to the USB ports Connecting external devices to the parallel or serial portPort settings Device driversPage Operation Switching the device onSwitching off the device Drive indicator, e.g. DVD Indicators provided by the deviceFloppy disk indicator Hard disk indicatorKeyboard ON/OFF switch optionalImportant keys and key combinations Enter keyMenu key Warm bootShift key Alt Gr e.g. German keyboardWorking with floppy disks Settings in Bios SetupPage Installing new software Troubleshooting and tipsMains voltage supply is faulty Internal power supply overloadedScreen stays blank Device cannot be switched off with the ON/OFF switchFloppy disk cannot be read or written No mouse pointer displayed on the screenWrong monitor has been set under Window XP Wrong RAM modules have been insertedRestoring the hard disk contents Error messages on the screenTime and/or date is not correct TipsInformation about boards System expansionsClosing the casing Opening and closing the casingOpening the casing Assembling and dismantling low-profile units Installing a boardRemoving the holding plate Removing a boardRemoving the drive cage Inserting and removing the drive cageRemoving the cross-piece Removing the front panelAttaching the drive cage Installing the drive cageDisconnecting cables Removing the drive cage System expansions IDE drives and serial ATA drives Installing and removing drivesInstalling the cross-piece Installing and removing the hard disk Removing and installing accessible drivesSystem expansions Extensions to the mainboard Replacing lithium batteryMaking changes on mainboard Upgrading main memoryFollowing changes Page Dimensions Technical dataWeight Electrical dataPage Data IndexCable Index Scsi