Contents
PoleVault Systems
Sicherheitsanleitungen Deutsch
Precautions
Safety Instructions English
Consignes de Sécurité Français
Introduction
PoleVault Systems Installation Introduction
FCC Class a Notice
Introduction, contd
PoleVault System installation and wiring overview
Room
Typical classroom installation
PoleVault Systems Installation Introduction Planning
Room layout
ADA overhead and side clearance requirements
Example of a classroom installation
Introduction Planning, cont’d
Location of the screen and projector
Location of MediaLink Controller and Wall Plates
Example classroom with four speaker installation
Type and location of the speakers
Inventory
Introduction Inventory Overview
Included items
PoleVault System Devices and Hardware, cont’d
PoleVault System Devices and Hardware, contd
PoleVault System Ceiling Speakers
Introduction Inventory Overview, cont’d
Items not included
Optional installation hardware
Installation tools
Outline of installation steps
Installation Overview
PoleVault Systems Installation Installation Overview
PMP Projector Mounting Pole
Where it goes Screws up into PCM
PoleVault Systems Installation Installation Stage
PCM 240 Projector Ceiling Mount
1a Mark the screen location
2c Install the PMP
2d Screw the adjuster plate onto the PMP
Mark screen location
2e Attach the bracket to the projector
Installation Stage One, cont’d
2f Slide and lock the projector onto the adjuster plate
Verify the image location
5d Screw the PMP into the mounting plate viewed from below
Installation
Using these dimensions, mark and cut a hole for
Cut the ceiling tile
Tighten the four T-bar securing screws on the PCM
Secure the Projector Ceiling Mount to the ceiling
6e Tighten the turnbuckles
6g Attach the safety cable to the PCM
Install the Screen
Power outlet installation on PCM
This stage involves installing the devices shown below
Stage Two Install the Wall Plates and MLC 104 IP
MLC 104 IP Plus MediaLink Controller
Cables
PVS 204SA switcher
MLC 104 IP Plus mud ring
Stage Two Install the Wallplates and MLC 104 IP Plus
Install mud rings
1d Features for mud ring installation
2c Pull the cables at each location
Signal Cable Label color
Pull cables
Projector communication cables from
Install wall plates
Installation Stage Two, cont’d
TWire stripping lengths
Install MediaLink Controller
4a Connecting the MLC to the switcher
Appropriate
4c Connect to the LAN using a CAT 5 cable
Connect the MLC to the projector with
An RS-232 cable or IR emitter cable, as
4e Secure the MLC 104 IP Plus to the mud ring
Connections made to the MLC 104 IP Plus
PV SI 3C LP Ceiling Speakers
Stage Three Install the PV SI 3C LP Ceiling Speakers
Cut ceiling tile
Cable the speakers
Installation Stage Three, cont’d
To terminate the cable, strip the end of the cable
Pole captive screw connector
4c Wire the captive screw connector Dual mono output
Stereo or dual mono output using parallel speaker wiring
5a Apply putty to speaker grill
Finish speaker installation
PMK 450 Pole Mount Kit
Stage Four Install the PMK 450 and the PVS 204SA
This stage covers installing the devices shown below
PVS 204SA PoleVault Switcher
Pull the cables
Installation Stage Four, cont’d
Install the PMK 450 Pole Mount kit
Switcher and projector cable overview
3d Set the DIP switches as desired
Install the PVS 204SA switcher
PMK 450 bottom plate and secure it using velcro
3c Wire the captive screw connector for the power supply
PVS 204SA cable connections
Finish installing the Pole Mount kit
BControl/power cable from the MLC 104 IP Plus
Connect the cables to the switcher
4c Attach and screw down rear plate
4d Replace projector on the adjuster plate
Launch GC2. Click on Help, then Contents or press F1
Stage Five Configure the System
Configure the system
1a Load Global Configurator 2 software
PoleVault Systems Installation Installation Stage
Test the system
Installation Stage Five, cont’d
Loosen all pivot screws and adjust the vertical angle
2c Check that an image is present, adjust as needed
Adjust the configuration as necessary
Final installation
Release the input button
Priority Page Controller included parts
Optional Accessory Installation PPC
Installation Procedure
Open the sensor and loop a wire around the sensor
Strip 3/16 of insulation from each conductor on the bare
Connect the power supply via the PoleVault switcher
Sensitivity knob adjustment
Testing and Adjustment Procedure
Priority Page Controller Time DIP switch settings
Reference Information
PoleVault Systems Installation Reference Information
Lbs 0.1 kg
Wall or furniture mountable with included Decora wall plate
Installation Reference Information, cont’d
Page
Extron USA West