g.Pass the safety cable through the fifth and center anchor and attach it to the center holes on either side of the plate.

Ensure the cable is of equal length on both sides of the anchor and secure the cable using the cable clamps.

Attach safety cable to center holes and secure with cable clamps.

TInstall any optional power outlets in the 2 gang opening on the mounting plate, towards the outside edge of the mount, so it does not interfere with the PMK 450 when installed.

CFor safety, all wiring of the electrical boxes and accessories should be completed after the plate is fully installed and secure.

6g Attach the safety cable to the PCM

PMK 450

Install power outlet in the 2-gang cutout (RACO box installed).

PCM 240

T-bar

(viewed from

 

above)

 

T Power outlet installation on the

PCM 240

7.Install the Screen

a.Following the screen manufacturers guidelines, continue to install the screen mounting brackets and then hang the screen.

TUse S-hooks to hang the screen from the brackets.

Bend the ends of the S-hooks so the screen does not fall when it is rolled up.

PoleVault Systems Installation • Installation — Stage 1

2-7

Image 19
Contents PoleVault Systems Sicherheitsanleitungen Deutsch PrecautionsSafety Instructions English Consignes de Sécurité FrançaisIntroduction PoleVault Systems Installation IntroductionFCC Class a Notice Introduction, contd PoleVault System installation and wiring overviewRoom Typical classroom installationPoleVault Systems Installation Introduction Planning Room layoutADA overhead and side clearance requirements Example of a classroom installationIntroduction Planning, cont’d Location of the screen and projectorLocation of MediaLink Controller and Wall Plates Example classroom with four speaker installationType and location of the speakers Inventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d PoleVault System Devices and Hardware, contdPoleVault System Ceiling Speakers Introduction Inventory Overview, cont’dItems not included Optional installation hardwareInstallation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation Overview PMP Projector Mounting Pole Where it goes Screws up into PCMPoleVault Systems Installation Installation Stage PCM 240 Projector Ceiling Mount1a Mark the screen location 2c Install the PMP2d Screw the adjuster plate onto the PMP Mark screen location 2e Attach the bracket to the projector Installation Stage One, cont’d 2f Slide and lock the projector onto the adjuster plate Verify the image location5d Screw the PMP into the mounting plate viewed from below InstallationUsing these dimensions, mark and cut a hole for Cut the ceiling tileTighten the four T-bar securing screws on the PCM Secure the Projector Ceiling Mount to the ceiling6e Tighten the turnbuckles 6g Attach the safety cable to the PCM Install the ScreenPower outlet installation on PCM This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IPMLC 104 IP Plus MediaLink Controller Cables PVS 204SA switcherMLC 104 IP Plus mud ring Stage Two Install the Wallplates and MLC 104 IP PlusInstall mud rings 1d Features for mud ring installation2c Pull the cables at each location Signal Cable Label colorPull cables Projector communication cables fromInstall wall plates Installation Stage Two, cont’dTWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher Appropriate 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with An RS-232 cable or IR emitter cable, as4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusPV SI 3C LP Ceiling Speakers Stage Three Install the PV SI 3C LP Ceiling SpeakersCut ceiling tile Cable the speakers Installation Stage Three, cont’dTo terminate the cable, strip the end of the cable Pole captive screw connector4c Wire the captive screw connector Dual mono output Stereo or dual mono output using parallel speaker wiring5a Apply putty to speaker grill Finish speaker installationPMK 450 Pole Mount Kit Stage Four Install the PMK 450 and the PVS 204SAThis stage covers installing the devices shown below PVS 204SA PoleVault SwitcherPull the cables Installation Stage Four, cont’dInstall the PMK 450 Pole Mount kit Switcher and projector cable overview3d Set the DIP switches as desired Install the PVS 204SA switcherPMK 450 bottom plate and secure it using velcro 3c Wire the captive screw connector for the power supplyPVS 204SA cable connections Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables to the switcher4c Attach and screw down rear plate 4d Replace projector on the adjuster plateLaunch GC2. Click on Help, then Contents or press F1 Stage Five Configure the SystemConfigure the system 1a Load Global Configurator 2 softwarePoleVault Systems Installation Installation Stage Test the system Installation Stage Five, cont’dLoosen all pivot screws and adjust the vertical angle 2c Check that an image is present, adjust as neededAdjust the configuration as necessary Final installationRelease the input button Priority Page Controller included parts Optional Accessory Installation PPCInstallation Procedure Open the sensor and loop a wire around the sensorStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Sensitivity knob adjustment Testing and Adjustment ProcedurePriority Page Controller Time DIP switch settings Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateInstallation Reference Information, cont’d Page Extron USA West
Related manuals
Manual 18 pages 30.9 Kb Manual 1 pages 17.57 Kb Manual 29 pages 11.77 Kb Manual 46 pages 60.91 Kb