Contents
PoleVault Systems
Safety Instructions English
Precautions
Consignes de Sécurité Français
Sicherheitsanleitungen Deutsch
PoleVault Systems Installation Introduction
Introduction
FCC Class a Notice
Introduction, contd
PoleVault System installation and wiring overview
PoleVault Systems Installation Introduction Planning
Typical classroom installation
Room layout
Room
Introduction Planning, cont’d
Example of a classroom installation
Location of the screen and projector
ADA overhead and side clearance requirements
Example classroom with four speaker installation
Location of MediaLink Controller and Wall Plates
Type and location of the speakers
Introduction Inventory Overview
Inventory
Included items
PoleVault System Devices and Hardware, cont’d
PoleVault System Devices and Hardware, contd
PoleVault System Ceiling Speakers
Introduction Inventory Overview, cont’d
Items not included
Optional installation hardware
Installation tools
Installation Overview
Outline of installation steps
PoleVault Systems Installation Installation Overview
PoleVault Systems Installation Installation Stage
Where it goes Screws up into PCM
PCM 240 Projector Ceiling Mount
PMP Projector Mounting Pole
2d Screw the adjuster plate onto the PMP
2c Install the PMP
Mark screen location
1a Mark the screen location
2f Slide and lock the projector onto the adjuster plate
Installation Stage One, cont’d
Verify the image location
2e Attach the bracket to the projector
Using these dimensions, mark and cut a hole for
Installation
Cut the ceiling tile
5d Screw the PMP into the mounting plate viewed from below
Secure the Projector Ceiling Mount to the ceiling
Tighten the four T-bar securing screws on the PCM
6e Tighten the turnbuckles
Install the Screen
6g Attach the safety cable to the PCM
Power outlet installation on PCM
Stage Two Install the Wall Plates and MLC 104 IP
This stage involves installing the devices shown below
MLC 104 IP Plus MediaLink Controller
Cables
PVS 204SA switcher
Install mud rings
Stage Two Install the Wallplates and MLC 104 IP Plus
1d Features for mud ring installation
MLC 104 IP Plus mud ring
Pull cables
Signal Cable Label color
Projector communication cables from
2c Pull the cables at each location
Install wall plates
Installation Stage Two, cont’d
Install MediaLink Controller
TWire stripping lengths
4a Connecting the MLC to the switcher
Connect the MLC to the projector with
4c Connect to the LAN using a CAT 5 cable
An RS-232 cable or IR emitter cable, as
Appropriate
4e Secure the MLC 104 IP Plus to the mud ring
Connections made to the MLC 104 IP Plus
PV SI 3C LP Ceiling Speakers
Stage Three Install the PV SI 3C LP Ceiling Speakers
Cut ceiling tile
Cable the speakers
Installation Stage Three, cont’d
4c Wire the captive screw connector Dual mono output
Pole captive screw connector
Stereo or dual mono output using parallel speaker wiring
To terminate the cable, strip the end of the cable
5a Apply putty to speaker grill
Finish speaker installation
This stage covers installing the devices shown below
Stage Four Install the PMK 450 and the PVS 204SA
PVS 204SA PoleVault Switcher
PMK 450 Pole Mount Kit
Install the PMK 450 Pole Mount kit
Installation Stage Four, cont’d
Switcher and projector cable overview
Pull the cables
PMK 450 bottom plate and secure it using velcro
Install the PVS 204SA switcher
3c Wire the captive screw connector for the power supply
3d Set the DIP switches as desired
BControl/power cable from the MLC 104 IP Plus
Finish installing the Pole Mount kit
Connect the cables to the switcher
PVS 204SA cable connections
4c Attach and screw down rear plate
4d Replace projector on the adjuster plate
Configure the system
Stage Five Configure the System
1a Load Global Configurator 2 software
Launch GC2. Click on Help, then Contents or press F1
PoleVault Systems Installation Installation Stage
Loosen all pivot screws and adjust the vertical angle
Installation Stage Five, cont’d
2c Check that an image is present, adjust as needed
Test the system
Final installation
Adjust the configuration as necessary
Release the input button
Installation Procedure
Optional Accessory Installation PPC
Open the sensor and loop a wire around the sensor
Priority Page Controller included parts
Strip 3/16 of insulation from each conductor on the bare
Connect the power supply via the PoleVault switcher
Testing and Adjustment Procedure
Sensitivity knob adjustment
Priority Page Controller Time DIP switch settings
Reference Information
PoleVault Systems Installation Reference Information
Lbs 0.1 kg
Wall or furniture mountable with included Decora wall plate
Installation Reference Information, cont’d
Page
Extron USA West