Extron electronic PVS 400, 300, 200 Final installation, Adjust the configuration as necessary

Page 41

d.Test the controller’s configuration with the following:

Check that the MLC is controlling the PVS 204SA switcher and projector, and does output the correct image when switching inputs.

Check the projector’s power control (turn it off and on at the MLC controller).

Adjust the configuration as necessary.

e.Adjust the audio input sensitivity as follows:

Ensure there is an audio source at each transmitter.

Set the MLC controller’s volume to maximum.

On the PVS 204SA switcher, press and hold the selected input buttons for 3 seconds. The input’s LED will blink.

While holding the input button in, rotate the level encoder until the Clip LED blinks, then turn the encoder back down until the blinking stops.

Release the input button.

Repeat Step e for all inputs.

f.If necessary adjust the amplifier level by rotating the same encoder used in Step e.

g.If necessary set the Aux/Mix level by rotating the Aux/Mix encoder.

AUDIO

 

AUX/MIX

LEVEL

 

MIN/MAX

CLIP

This LED flashes when the

 

 

 

 

amplifier output is clipping.

2e Set MLC volume to maximum, and adjust the level on the switcher

3.Final installation

a.Replace the front plate of the PMK 450. The power cable can exit the unit through the power cable access slot at the rear.

Front

Plate

FRONT

b.Tighten down all six screws on the PMK 450, four on the front and rear plates, and two on the sides.

c.Check and tighten the adjuster plate locking screws on the projector bracket.

Tighten Front and

 

Rear Plate Screws (4)

REAR

and Side Screws (2)

 

 

Cable from

 

power source

3a Replace the front plate and 3b tighten down the screws on the mounting kit

PoleVault Systems Installation • Installation — Stage 5

2-29

Image 41
Contents PoleVault Systems Safety Instructions English PrecautionsConsignes de Sécurité Français Sicherheitsanleitungen DeutschFCC Class a Notice PoleVault Systems Installation IntroductionIntroduction Introduction, contd PoleVault System installation and wiring overviewPoleVault Systems Installation Introduction Planning Typical classroom installationRoom layout RoomIntroduction Planning, cont’d Example of a classroom installationLocation of the screen and projector ADA overhead and side clearance requirementsType and location of the speakers Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Included items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, cont’d PoleVault System Devices and Hardware, contdPoleVault System Ceiling Speakers Introduction Inventory Overview, cont’dItems not included Optional installation hardwareInstallation tools PoleVault Systems Installation Installation Overview Installation OverviewOutline of installation steps PoleVault Systems Installation Installation Stage Where it goes Screws up into PCMPCM 240 Projector Ceiling Mount PMP Projector Mounting Pole2d Screw the adjuster plate onto the PMP 2c Install the PMPMark screen location 1a Mark the screen location2f Slide and lock the projector onto the adjuster plate Installation Stage One, cont’dVerify the image location 2e Attach the bracket to the projectorUsing these dimensions, mark and cut a hole for InstallationCut the ceiling tile 5d Screw the PMP into the mounting plate viewed from below6e Tighten the turnbuckles Secure the Projector Ceiling Mount to the ceilingTighten the four T-bar securing screws on the PCM Power outlet installation on PCM Install the Screen6g Attach the safety cable to the PCM MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IPThis stage involves installing the devices shown below Cables PVS 204SA switcherInstall mud rings Stage Two Install the Wallplates and MLC 104 IP Plus1d Features for mud ring installation MLC 104 IP Plus mud ringPull cables Signal Cable Label colorProjector communication cables from 2c Pull the cables at each locationInstall wall plates Installation Stage Two, cont’d4a Connecting the MLC to the switcher Install MediaLink ControllerTWire stripping lengths Connect the MLC to the projector with 4c Connect to the LAN using a CAT 5 cableAn RS-232 cable or IR emitter cable, as Appropriate4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusPV SI 3C LP Ceiling Speakers Stage Three Install the PV SI 3C LP Ceiling SpeakersCut ceiling tile Cable the speakers Installation Stage Three, cont’d4c Wire the captive screw connector Dual mono output Pole captive screw connectorStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable5a Apply putty to speaker grill Finish speaker installationThis stage covers installing the devices shown below Stage Four Install the PMK 450 and the PVS 204SAPVS 204SA PoleVault Switcher PMK 450 Pole Mount KitInstall the PMK 450 Pole Mount kit Installation Stage Four, cont’dSwitcher and projector cable overview Pull the cablesPMK 450 bottom plate and secure it using velcro Install the PVS 204SA switcher3c Wire the captive screw connector for the power supply 3d Set the DIP switches as desiredBControl/power cable from the MLC 104 IP Plus Finish installing the Pole Mount kitConnect the cables to the switcher PVS 204SA cable connections4c Attach and screw down rear plate 4d Replace projector on the adjuster plate Configure the system Stage Five Configure the System 1a Load Global Configurator 2 software Launch GC2. Click on Help, then Contents or press F1PoleVault Systems Installation Installation Stage Loosen all pivot screws and adjust the vertical angle Installation Stage Five, cont’d2c Check that an image is present, adjust as needed Test the systemRelease the input button Final installationAdjust the configuration as necessary Installation Procedure Optional Accessory Installation PPCOpen the sensor and loop a wire around the sensor Priority Page Controller included partsStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Priority Page Controller Time DIP switch settings Testing and Adjustment ProcedureSensitivity knob adjustment Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateInstallation Reference Information, cont’d Page Extron USA West
Related manuals
Manual 18 pages 30.9 Kb Manual 1 pages 17.57 Kb Manual 29 pages 11.77 Kb Manual 46 pages 60.91 Kb