Extron electronic PVS 400, 300, 200 manual 4c Attach and screw down rear plate

Page 37

b.Align the bottom plate lugs with the slots in the top plate and slide up and into place.

c.Attach the rear plate to secure the PMK 450. Ensure the power cable exits via the cable notch in the top plate, or via the gap in front of the filler plate at the bottom (see

4d image).

FRONT

 

 

REAR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rear Plate

4c Attach and screw down rear plate

d.Screw the UPB 25 adjuster plate back onto the base of the PMP, and replace the projector (with the UPB 25 bracket attached) on the adjuster plate.

e.Connect the switchers VGA and RCA cables to the projector.

f.Connect the projector control cable from the MLC to the projector. Refer to the projector’s user manual for RS-232control port pinout details.

4d Replace projector on the adjuster plate

PoleVault Systems Installation • Installation — Stage 4 2-25

Image 37
Contents PoleVault Systems Safety Instructions English PrecautionsConsignes de Sécurité Français Sicherheitsanleitungen DeutschIntroduction PoleVault Systems Installation IntroductionFCC Class a Notice Introduction, contd PoleVault System installation and wiring overviewPoleVault Systems Installation Introduction Planning Typical classroom installationRoom layout RoomIntroduction Planning, cont’d Example of a classroom installationLocation of the screen and projector ADA overhead and side clearance requirementsLocation of MediaLink Controller and Wall Plates Example classroom with four speaker installationType and location of the speakers Inventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d PoleVault System Devices and Hardware, contdPoleVault System Ceiling Speakers Introduction Inventory Overview, cont’dItems not included Optional installation hardwareInstallation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation Overview PoleVault Systems Installation Installation Stage Where it goes Screws up into PCMPCM 240 Projector Ceiling Mount PMP Projector Mounting Pole2d Screw the adjuster plate onto the PMP 2c Install the PMPMark screen location 1a Mark the screen location2f Slide and lock the projector onto the adjuster plate Installation Stage One, cont’dVerify the image location 2e Attach the bracket to the projectorUsing these dimensions, mark and cut a hole for InstallationCut the ceiling tile 5d Screw the PMP into the mounting plate viewed from belowTighten the four T-bar securing screws on the PCM Secure the Projector Ceiling Mount to the ceiling6e Tighten the turnbuckles 6g Attach the safety cable to the PCM Install the ScreenPower outlet installation on PCM This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IPMLC 104 IP Plus MediaLink Controller Cables PVS 204SA switcherInstall mud rings Stage Two Install the Wallplates and MLC 104 IP Plus1d Features for mud ring installation MLC 104 IP Plus mud ringPull cables Signal Cable Label colorProjector communication cables from 2c Pull the cables at each locationInstall wall plates Installation Stage Two, cont’dTWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher Connect the MLC to the projector with 4c Connect to the LAN using a CAT 5 cableAn RS-232 cable or IR emitter cable, as Appropriate4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusPV SI 3C LP Ceiling Speakers Stage Three Install the PV SI 3C LP Ceiling SpeakersCut ceiling tile Cable the speakers Installation Stage Three, cont’d4c Wire the captive screw connector Dual mono output Pole captive screw connectorStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable5a Apply putty to speaker grill Finish speaker installationThis stage covers installing the devices shown below Stage Four Install the PMK 450 and the PVS 204SAPVS 204SA PoleVault Switcher PMK 450 Pole Mount Kit Install the PMK 450 Pole Mount kit Installation Stage Four, cont’d Switcher and projector cable overview Pull the cablesPMK 450 bottom plate and secure it using velcro Install the PVS 204SA switcher3c Wire the captive screw connector for the power supply 3d Set the DIP switches as desiredBControl/power cable from the MLC 104 IP Plus Finish installing the Pole Mount kitConnect the cables to the switcher PVS 204SA cable connections4c Attach and screw down rear plate 4d Replace projector on the adjuster plateConfigure the system Stage Five Configure the System1a Load Global Configurator 2 software Launch GC2. Click on Help, then Contents or press F1PoleVault Systems Installation Installation Stage Loosen all pivot screws and adjust the vertical angle Installation Stage Five, cont’d2c Check that an image is present, adjust as needed Test the systemAdjust the configuration as necessary Final installationRelease the input button Installation Procedure Optional Accessory Installation PPCOpen the sensor and loop a wire around the sensor Priority Page Controller included partsStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Sensitivity knob adjustment Testing and Adjustment ProcedurePriority Page Controller Time DIP switch settings Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateInstallation Reference Information, cont’d Page Extron USA West
Related manuals
Manual 18 pages 30.9 Kb Manual 1 pages 17.57 Kb Manual 29 pages 11.77 Kb Manual 46 pages 60.91 Kb