Extron electronic 300, PVS 400, 200 Optional Accessory Installation PPC, Installation Procedure

Page 42

Optional Accessory Installation — PPC 25

The Priority Page Controller (PPC 25) momentarily silences classroom audio whenever a page is made from a public address (PA) system.

For detailed information, refer to the PPC 25 Installation Instructions, supplied with the device.

NThe Priority Page Controller works with traditional 25 V or 70 V and 4/8 ohm PA systems. It is not designed for, and may not work properly with, two-way intercoms, or systems that are IP-based or use digital clocks.

Priority Page Controller included parts:

Priority Page Controller

Priority Page Sensor

UL-compliant junction box with a cable clamp and a lid

35' (10.7 m) of sensor cable

Y-cable for sharing power with another unit

Installation Procedure

WAll structural steps, anchoring, and electrical installation should be performed by qualified personnel in accordance with local and national building codes, fire and safety codes, and/or local and national electrical codes.

To meet the plenum rating requirement, the Priority Page Sensor assembly must be installed in a UL-compliant junction box with a cover and all cables to and from the sensor must be plenum rated.

1. Choose suitable locations for the controller and sensor. The controller must be located close to the PVS 204SA and its power supply. The sensor must be located near, and in series with, the speakers.

2. If the sensor is to be located in a plenum space, the junction box (provided) can be used. Knock out an opening at one end of the junction box and attach the cable clamp (see figure at right). Secure the box where the sensor will go.

3. Disconnect the PA system speaker cable from the speaker.

Remove the outer protective jacket from the speaker cable to expose the two speaker wires from the sensor to the speaker (as shown at right). Do not remove the inner protective jackets that cover the individual wires.

2UL-compliant junction box and cover

Open the

Page Sensor

If the sensor is to be located in a plenum space, feed a loop of one of the exposed speaker wires through the cable clamp into the junction box. The other wire must bypass the sensor to be connected later directly to the speaker.

4.Open the top of the Priority Page Sensor and loop the speaker wire that is inside the junction box, tightly around the top part of the sensor.

NLoop only one of the speaker wires around the sensor cover. Do not loop both wires. Polarity need not be observed.

Speaker Cable with Plenum Jacket Intact

Strip plenum jacket from speaker cable to reveal two speaker wires.

Priority

Page

Sensor

Ceiling Mounted

Paging Speaker

The other speaker wire must bypass the sensor and connect directly to the speaker.

For a 25 V or 70 V system, wrap 5 to 8 loops.

For a 4/8 ohm system, wrap 2 to 4 loops.

4Open the sensor and loop a wire around the sensor

2-30 PoleVault Systems Installation • Optional Accessory Installation

Image 42
Contents PoleVault Systems Consignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschPoleVault Systems Installation Introduction IntroductionFCC Class a Notice PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example of a classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsExample classroom with four speaker installation Location of MediaLink Controller and Wall PlatesType and location of the speakers Introduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, contd PoleVault System Devices and Hardware, cont’dIntroduction Inventory Overview, cont’d PoleVault System Ceiling SpeakersOptional installation hardware Items not includedInstallation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation Overview PCM 240 Projector Ceiling Mount Where it goes Screws up into PCMPoleVault Systems Installation Installation Stage PMP Projector Mounting PoleMark screen location 2c Install the PMP2d Screw the adjuster plate onto the PMP 1a Mark the screen locationVerify the image location Installation Stage One, cont’d2f Slide and lock the projector onto the adjuster plate 2e Attach the bracket to the projectorCut the ceiling tile InstallationUsing these dimensions, mark and cut a hole for 5d Screw the PMP into the mounting plate viewed from belowSecure the Projector Ceiling Mount to the ceiling Tighten the four T-bar securing screws on the PCM6e Tighten the turnbuckles Install the Screen 6g Attach the safety cable to the PCMPower outlet installation on PCM Stage Two Install the Wall Plates and MLC 104 IP This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller PVS 204SA switcher Cables1d Features for mud ring installation Stage Two Install the Wallplates and MLC 104 IP PlusInstall mud rings MLC 104 IP Plus mud ringProjector communication cables from Signal Cable Label colorPull cables 2c Pull the cables at each locationInstallation Stage Two, cont’d Install wall platesInstall MediaLink Controller TWire stripping lengths4a Connecting the MLC to the switcher An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the PV SI 3C LP Ceiling Speakers PV SI 3C LP Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’d Cable the speakersStereo or dual mono output using parallel speaker wiring Pole captive screw connector4c Wire the captive screw connector Dual mono output To terminate the cable, strip the end of the cableFinish speaker installation 5a Apply putty to speaker grillPVS 204SA PoleVault Switcher Stage Four Install the PMK 450 and the PVS 204SAThis stage covers installing the devices shown below PMK 450 Pole Mount KitSwitcher and projector cable overview Installation Stage Four, cont’dInstall the PMK 450 Pole Mount kit Pull the cables3c Wire the captive screw connector for the power supply Install the PVS 204SA switcherPMK 450 bottom plate and secure it using velcro 3d Set the DIP switches as desiredConnect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus PVS 204SA cable connections4d Replace projector on the adjuster plate 4c Attach and screw down rear plate1a Load Global Configurator 2 software Stage Five Configure the SystemConfigure the system Launch GC2. Click on Help, then Contents or press F1 PoleVault Systems Installation Installation Stage 2c Check that an image is present, adjust as needed Installation Stage Five, cont’dLoosen all pivot screws and adjust the vertical angle Test the systemFinal installation Adjust the configuration as necessaryRelease the input button Open the sensor and loop a wire around the sensor Optional Accessory Installation PPCInstallation Procedure Priority Page Controller included partsStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Testing and Adjustment Procedure Sensitivity knob adjustmentPriority Page Controller Time DIP switch settings PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgInstallation Reference Information, cont’d Page Extron USA West
Related manuals
Manual 18 pages 30.9 Kb Manual 1 pages 17.57 Kb Manual 29 pages 11.77 Kb Manual 46 pages 60.91 Kb