Extron electronic 200, PVS 400, 300 manual Connections made to the MLC 104 IP Plus

Page 27

The connections between the MLC 104 IP Plus and the PVS 204SA switcher should look like this.

e.Sliding the cables into the opening, secure the

MLC 104 IP Plus to the mud ring with the provided machine screws

 

 

RGB

VIDEO

RGB

 

 

 

 

 

LISTED 17TT

 

 

 

AMPLIFIED OUTPUTS

 

1A

2A

3

 

 

12

 

 

 

 

DO NOT GROUND

 

4/8

 

 

 

 

 

 

-

SwitcherPoleVault204SAPVS

 

US AUDIO/VIDEO

 

 

 

I

 

 

S

IIIIIIIIIIIIIIIIIIIIIIIII

WO564871235411EA024ERD56

 

 

APPARATUS

 

 

OR SHORT

 

Ohms

 

 

 

O

 

 

 

Plenum Rated UL 2043

SPEAKER OUTPUTS

 

 

N

 

 

U

 

 

 

Suitable for Use in Air-Handling Spaces

 

 

 

 

POWER

P

 

 

T

 

 

 

 

 

 

 

 

 

L

R

U

 

 

P

 

 

 

 

ON

STEREO

AUX/MIX IN

RS-232 MLC/IR

DC VOL

 

T

 

 

U

 

 

 

HIGH

ON

Tx Rx IR

12V

 

S

 

 

 

 

 

 

 

 

 

 

 

 

 

T

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PASS

 

 

 

 

 

 

 

 

 

 

 

 

 

S/N

 

FILTER

 

 

 

 

 

 

12V

1B

2B

4

 

 

 

 

 

OFF

DUAL

 

 

A B C

 

10V

3A MAX

 

 

 

VIDEO

 

 

 

 

MONO

 

 

 

 

VOL/MUTE

PVS 204SA Switcher Rear Panel

TCP/IP

 

 

4a

 

 

 

CAT 5, 5e, or 6 Cable

 

RS-232

 

 

Network

 

 

 

4c

and Power

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LAN

PRESS TAB WITH

 

 

4b RS-232 Control

TWEEKER TO REMOVE

 

 

 

 

 

 

 

 

 

Tx Rx GROUND OUTIR

OUT+12V GROUND CM IRIN SCP

1 2 3 GROUND

Rx

Tx

GROUND

GROUND +12VIN

 

 

 

 

A

B

 

 

 

DISPLAY

A B C D E

DIGITAL

MLS

 

POWER

 

RS-232/IR

COMM LINK

I/O

RS-232

12V

Projector

 

 

 

 

 

 

 

MLC 104 IP Plus Right Side Panel

Connections made to the MLC 104 IP Plus

Extron

MR 200

Modular Mud Ring

Rotate locking arm and insert into wall opening.

 

VCR

DISPLAY

D

OFF

DV

ON

 

PC

VOLUME

IP Plus

Extron

104

MLC

MLC 104 IP Plus

 

 

Extron

4e Secure the MLC 104 IP Plus to the mud ring

PoleVault Systems Installation • Installation — Stage 2

2-15

Image 27
Contents PoleVault Systems Sicherheitsanleitungen Deutsch PrecautionsSafety Instructions English Consignes de Sécurité FrançaisPoleVault Systems Installation Introduction IntroductionFCC Class a Notice Introduction, contd PoleVault System installation and wiring overviewRoom Typical classroom installationPoleVault Systems Installation Introduction Planning Room layoutADA overhead and side clearance requirements Example of a classroom installationIntroduction Planning, cont’d Location of the screen and projectorExample classroom with four speaker installation Location of MediaLink Controller and Wall PlatesType and location of the speakers Introduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, cont’d PoleVault System Devices and Hardware, contdPoleVault System Ceiling Speakers Introduction Inventory Overview, cont’dItems not included Optional installation hardwareInstallation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation Overview PMP Projector Mounting Pole Where it goes Screws up into PCMPoleVault Systems Installation Installation Stage PCM 240 Projector Ceiling Mount1a Mark the screen location 2c Install the PMP2d Screw the adjuster plate onto the PMP Mark screen location2e Attach the bracket to the projector Installation Stage One, cont’d2f Slide and lock the projector onto the adjuster plate Verify the image location5d Screw the PMP into the mounting plate viewed from below InstallationUsing these dimensions, mark and cut a hole for Cut the ceiling tileSecure the Projector Ceiling Mount to the ceiling Tighten the four T-bar securing screws on the PCM6e Tighten the turnbuckles Install the Screen 6g Attach the safety cable to the PCMPower outlet installation on PCM Stage Two Install the Wall Plates and MLC 104 IP This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller Cables PVS 204SA switcherMLC 104 IP Plus mud ring Stage Two Install the Wallplates and MLC 104 IP PlusInstall mud rings 1d Features for mud ring installation2c Pull the cables at each location Signal Cable Label colorPull cables Projector communication cables from Install wall plates Installation Stage Two, cont’dInstall MediaLink Controller TWire stripping lengths4a Connecting the MLC to the switcher Appropriate 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with An RS-232 cable or IR emitter cable, as4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusPV SI 3C LP Ceiling Speakers Stage Three Install the PV SI 3C LP Ceiling SpeakersCut ceiling tile Cable the speakers Installation Stage Three, cont’dTo terminate the cable, strip the end of the cable Pole captive screw connector4c Wire the captive screw connector Dual mono output Stereo or dual mono output using parallel speaker wiring5a Apply putty to speaker grill Finish speaker installationPMK 450 Pole Mount Kit Stage Four Install the PMK 450 and the PVS 204SAThis stage covers installing the devices shown below PVS 204SA PoleVault SwitcherPull the cables Installation Stage Four, cont’dInstall the PMK 450 Pole Mount kit Switcher and projector cable overview3d Set the DIP switches as desired Install the PVS 204SA switcherPMK 450 bottom plate and secure it using velcro 3c Wire the captive screw connector for the power supplyPVS 204SA cable connections Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables to the switcher4c Attach and screw down rear plate 4d Replace projector on the adjuster plateLaunch GC2. Click on Help, then Contents or press F1 Stage Five Configure the SystemConfigure the system 1a Load Global Configurator 2 softwarePoleVault Systems Installation Installation Stage Test the system Installation Stage Five, cont’dLoosen all pivot screws and adjust the vertical angle 2c Check that an image is present, adjust as neededFinal installation Adjust the configuration as necessaryRelease the input button Priority Page Controller included parts Optional Accessory Installation PPCInstallation Procedure Open the sensor and loop a wire around the sensorStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Testing and Adjustment Procedure Sensitivity knob adjustmentPriority Page Controller Time DIP switch settings Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateInstallation Reference Information, cont’d Page Extron USA West
Related manuals
Manual 18 pages 30.9 Kb Manual 1 pages 17.57 Kb Manual 29 pages 11.77 Kb Manual 46 pages 60.91 Kb