Extron electronic 400 Stage Four Install the PMK 450 and the PVS 204SA, PMK 450 Pole Mount Kit

Page 33

Stage Four — Install the PMK 450 and the PVS 204SA

Stage 4

This stage covers installing the devices shown below.

PMK 450 Pole Mount Kit

Front Plate (1)

Top Plate (1)

Pipe Collar (1) with

Set Screws (4)

AC Power Cord

Access Slot

Plate

Screws (2)

Security Screws (2)

Rear Plate (1)

Bottom Plate (1)

Filler Plate (1)

Where it goes: Attaches to PMP around cable access hole, above the projector.

What it does: Supports and hides the installed PVS 204SA switcher, power supply, and any installed optional

accessories.

PVS 204SA PoleVault Switcher

Power Supply and Cable

4

INPUTS

VIDEO

3

2

RGB

1

 

 

 

 

204SA

 

 

 

PVSSWITCHER

 

 

 

AU

LT

 

 

 

 

 

 

POLEV

 

 

AU

DIO

 

 

 

 

CLIP

 

 

LEVEL

 

 

 

 

AU

X/MIX

 

 

 

 

 

 

CONFIG

MIN/MAX

 

PVT RGB D

PVT CV D

Input

Input

RGBVIDEO

1A

2A

33

 

I

 

 

 

N

 

 

POWER

P

 

 

U

 

 

 

T

 

 

 

S

 

 

12V

1B

2B

44

3A MAX

 

 

 

RGB

Rear View

Speaker

 

Output

 

Output

RGB

 

 

 

 

 

LISTED 17TT

 

 

 

AMPLIFIED OUTPUTS

 

 

-12

 

 

 

 

 

 

 

 

 

 

 

®

US AUDIO/VIDEO

 

 

 

 

 

 

 

WO564871235411EA024ERD56

 

 

DO NOT GROUND

 

4/8

 

IIIIIIIIIIIIIIIIIIIIIIIII

SwitcherPoleVault204SAPVS

PASS

 

APPARATUS

 

 

 

 

 

 

 

 

 

 

OR SHORT

 

Ohms

 

 

 

 

 

 

 

 

 

 

O

 

 

 

Plenum Rated UL 2043

SPEAKER OUTPUTS

 

 

U

 

 

 

Suitable for Use in Air-Handling Spaces

 

 

L

R

T

 

 

 

 

 

 

 

 

 

P

 

 

 

 

ON

STEREO

AUX/MIX IN

RS-232 MLC/IR

DC VOL

U

 

 

 

HIGH

ON

Tx Rx IR

12V

T

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S

 

S/N

 

FILTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OFF

DUAL

 

 

A B C

 

10V

VIDEO

 

 

 

 

MONO

 

 

 

 

VOL/MUTE

 

 

 

 

 

 

 

 

 

Power Supply

Connector

Video

Aux/Mix

MLC Control

Output

Input

Port

Where it goes: PVS 204SA and power supply install on the base plate of the PMK 450.

What it does: Receives input video and audio signals from A/V source input wall plates, outputs and switches the signals to projector and ceiling speakers.

Cables

VGA cable (connects to RGB output and projector)

MVGA M-M, 3'

 

RCA cable (connects to video output and projector)

V RCA, 3'

PoleVault Systems Installation • Installation — Stage 4 2-21

Image 33
Contents PoleVault Systems Safety Instructions English PrecautionsConsignes de Sécurité Français Sicherheitsanleitungen DeutschPoleVault Systems Installation Introduction IntroductionFCC Class a Notice Introduction, contd PoleVault System installation and wiring overviewPoleVault Systems Installation Introduction Planning Typical classroom installationRoom layout RoomIntroduction Planning, cont’d Example of a classroom installationLocation of the screen and projector ADA overhead and side clearance requirementsExample classroom with four speaker installation Location of MediaLink Controller and Wall PlatesType and location of the speakers Introduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, cont’d PoleVault System Devices and Hardware, contdPoleVault System Ceiling Speakers Introduction Inventory Overview, cont’dItems not included Optional installation hardwareInstallation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation Overview PoleVault Systems Installation Installation Stage Where it goes Screws up into PCMPCM 240 Projector Ceiling Mount PMP Projector Mounting Pole2d Screw the adjuster plate onto the PMP 2c Install the PMPMark screen location 1a Mark the screen location2f Slide and lock the projector onto the adjuster plate Installation Stage One, cont’dVerify the image location 2e Attach the bracket to the projectorUsing these dimensions, mark and cut a hole for InstallationCut the ceiling tile 5d Screw the PMP into the mounting plate viewed from belowSecure the Projector Ceiling Mount to the ceiling Tighten the four T-bar securing screws on the PCM6e Tighten the turnbuckles Install the Screen 6g Attach the safety cable to the PCMPower outlet installation on PCM Stage Two Install the Wall Plates and MLC 104 IP This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller Cables PVS 204SA switcherInstall mud rings Stage Two Install the Wallplates and MLC 104 IP Plus1d Features for mud ring installation MLC 104 IP Plus mud ringPull cables Signal Cable Label colorProjector communication cables from 2c Pull the cables at each locationInstall wall plates Installation Stage Two, cont’dInstall MediaLink Controller TWire stripping lengths4a Connecting the MLC to the switcher Connect the MLC to the projector with 4c Connect to the LAN using a CAT 5 cableAn RS-232 cable or IR emitter cable, as Appropriate4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusPV SI 3C LP Ceiling Speakers Stage Three Install the PV SI 3C LP Ceiling SpeakersCut ceiling tile Cable the speakers Installation Stage Three, cont’d4c Wire the captive screw connector Dual mono output Pole captive screw connectorStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable5a Apply putty to speaker grill Finish speaker installationThis stage covers installing the devices shown below Stage Four Install the PMK 450 and the PVS 204SAPVS 204SA PoleVault Switcher PMK 450 Pole Mount KitInstall the PMK 450 Pole Mount kit Installation Stage Four, cont’dSwitcher and projector cable overview Pull the cablesPMK 450 bottom plate and secure it using velcro Install the PVS 204SA switcher3c Wire the captive screw connector for the power supply 3d Set the DIP switches as desiredBControl/power cable from the MLC 104 IP Plus Finish installing the Pole Mount kitConnect the cables to the switcher PVS 204SA cable connections4c Attach and screw down rear plate 4d Replace projector on the adjuster plateConfigure the system Stage Five Configure the System1a Load Global Configurator 2 software Launch GC2. Click on Help, then Contents or press F1PoleVault Systems Installation Installation Stage Loosen all pivot screws and adjust the vertical angle Installation Stage Five, cont’d2c Check that an image is present, adjust as needed Test the systemFinal installation Adjust the configuration as necessaryRelease the input button Installation Procedure Optional Accessory Installation PPCOpen the sensor and loop a wire around the sensor Priority Page Controller included partsStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Testing and Adjustment Procedure Sensitivity knob adjustmentPriority Page Controller Time DIP switch settings Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateInstallation Reference Information, cont’d Page Extron USA West
Related manuals
Manual 18 pages 30.9 Kb Manual 1 pages 17.57 Kb Manual 29 pages 11.77 Kb Manual 46 pages 60.91 Kb