Extron electronic 300, PVS 400, 200 manual Connect the MLC to the projector with, Appropriate

Page 26

Installation — Stage Two, cont’d

b.Connect the IR/RS-232 projector communication cable as shown for either RS-232 or IR projector control.

c.Connect a CAT 5, 5e, or 6 straight through cable to the MLC ‘s RJ-45 jack.

WDO NOT connect the MLC’s RJ-45 jack to the PVS 204SA twisted pair inputs.

RS-232 connection

Transmit (Tx)

Receive (Rx) RS-232 to projector Ground ( )

Tx Rx

GROUND IR OUT

 

Terminal

RS-232 Cable color

Pin

 

 

 

 

 

 

 

 

 

 

DISPLAY

 

 

Tx

White

 

 

 

 

 

2

RS-232/IR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MLC 104 IP Plus

 

 

Rx

Violet

 

 

 

 

 

3

Right Side Panel

 

 

 

 

 

 

 

 

 

 

 

 

Ground

Shield

 

 

 

 

 

5

 

 

IR connection

Black

IR Emitter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ground (

)

 

 

 

 

 

To projector

 

 

IR Signal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Black

 

Red

Unidirectional IR Output

 

 

 

 

 

 

 

 

 

via White Striped Wire

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

100'

 

 

 

 

 

 

Tx Rx

GROUND

IR OUT

 

 

(30.5 m)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DISPLAY

 

 

 

 

 

 

 

 

 

 

RS-232/IR

 

 

 

 

 

 

 

 

 

 

MLC 104 IP Plus

 

 

 

 

 

 

 

 

 

 

Right Side Panel

 

 

 

 

 

 

 

 

 

 

Terminal

 

IR/RS-232

IR Cable color

 

 

 

 

 

Cable color

 

 

 

 

 

 

Ground

 

 

Black

 

Black

 

 

 

 

IR Signal

 

 

Red

 

White/Black

 

Connecting RS-232 Cable

Connecting IR Cable

 

 

 

 

 

 

 

 

 

IR Emitter

 

 

 

 

 

 

 

Projector

White

 

 

 

 

 

 

 

Projector

 

 

 

 

Black

 

 

 

 

 

 

(or striped)

 

 

 

 

 

 

 

 

 

 

 

 

 

MLC IR/RS-232

 

 

 

 

 

 

 

 

9-Pin Female

Comm Cable

 

 

Red

 

 

 

 

 

 

 

 

 

 

Black

NRed and Black

 

 

 

 

 

 

 

 

 

Not Used

 

 

 

N White, Violet, and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Shield Not Used

 

 

White

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Shield

Red

Black

 

 

 

 

 

 

 

Violet

 

 

 

 

 

 

 

 

 

 

 

 

Tx Rx GROUND

Tx/IR

Rx GROUND PWR SNS GROUND +12V OUT

Tx Rx GROUND Tx/IR Rx GROUND PWR SNS GROUND

+12V OUT

 

 

 

 

 

 

HOST/

 

 

PROJECTOR

HOST/

PROJECTOR

 

 

 

 

 

 

 

CONFIG

 

RS-232/IR

CONFIG

RS-232/IR

 

 

 

 

 

 

 

 

 

 

MLC 104 IP Plus

 

 

 

 

 

 

4b

Connect the MLC to the projector with

 

 

an RS-232 cable or IR emitter cable, as

 

 

appropriate.

 

 

 

 

 

 

 

 

TCP/IP

 

 

CAT 5, 5e or 6 Cable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Network

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PRESS TAB WITH

 

 

 

 

 

 

 

 

 

LAN TWEEKER TO REMOVE

 

 

 

 

 

 

 

 

Tx Rx GROUND OUTIR

OUT+12V GROUND CM IRIN SCP 1

2 3 GROUND

Rx Tx

GROUND

GROUND +12VIN

 

 

 

 

 

 

 

 

 

 

A B

 

 

 

 

 

 

 

 

 

DISPLAY

A B C D E

DIGITAL

MLS

 

POWER

 

 

 

 

 

 

 

RS-232/IR

COMM LINK

I/O

RS-232

12V

 

MLC 104 IP Plus Right Side Panel

4c Connect to the LAN using a CAT 5 cable

2-14 PoleVault Systems Installation • Installation — Stage 2

Image 26
Contents PoleVault Systems Consignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschFCC Class a Notice PoleVault Systems Installation IntroductionIntroduction PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example of a classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsType and location of the speakers Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Included items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, contd PoleVault System Devices and Hardware, cont’dIntroduction Inventory Overview, cont’d PoleVault System Ceiling SpeakersOptional installation hardware Items not includedInstallation tools PoleVault Systems Installation Installation Overview Installation OverviewOutline of installation steps PCM 240 Projector Ceiling Mount Where it goes Screws up into PCMPoleVault Systems Installation Installation Stage PMP Projector Mounting PoleMark screen location 2c Install the PMP2d Screw the adjuster plate onto the PMP 1a Mark the screen locationVerify the image location Installation Stage One, cont’d2f Slide and lock the projector onto the adjuster plate 2e Attach the bracket to the projectorCut the ceiling tile InstallationUsing these dimensions, mark and cut a hole for 5d Screw the PMP into the mounting plate viewed from below6e Tighten the turnbuckles Secure the Projector Ceiling Mount to the ceilingTighten the four T-bar securing screws on the PCM Power outlet installation on PCM Install the Screen6g Attach the safety cable to the PCM MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IPThis stage involves installing the devices shown below PVS 204SA switcher Cables1d Features for mud ring installation Stage Two Install the Wallplates and MLC 104 IP PlusInstall mud rings MLC 104 IP Plus mud ring Projector communication cables from Signal Cable Label color Pull cables 2c Pull the cables at each locationInstallation Stage Two, cont’d Install wall plates4a Connecting the MLC to the switcher Install MediaLink ControllerTWire stripping lengths An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the PV SI 3C LP Ceiling Speakers PV SI 3C LP Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’d Cable the speakersStereo or dual mono output using parallel speaker wiring Pole captive screw connector4c Wire the captive screw connector Dual mono output To terminate the cable, strip the end of the cableFinish speaker installation 5a Apply putty to speaker grillPVS 204SA PoleVault Switcher Stage Four Install the PMK 450 and the PVS 204SAThis stage covers installing the devices shown below PMK 450 Pole Mount KitSwitcher and projector cable overview Installation Stage Four, cont’dInstall the PMK 450 Pole Mount kit Pull the cables3c Wire the captive screw connector for the power supply Install the PVS 204SA switcherPMK 450 bottom plate and secure it using velcro 3d Set the DIP switches as desiredConnect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus PVS 204SA cable connections4d Replace projector on the adjuster plate 4c Attach and screw down rear plate1a Load Global Configurator 2 software Stage Five Configure the SystemConfigure the system Launch GC2. Click on Help, then Contents or press F1PoleVault Systems Installation Installation Stage 2c Check that an image is present, adjust as needed Installation Stage Five, cont’dLoosen all pivot screws and adjust the vertical angle Test the systemRelease the input button Final installationAdjust the configuration as necessary Open the sensor and loop a wire around the sensor Optional Accessory Installation PPCInstallation Procedure Priority Page Controller included partsStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Priority Page Controller Time DIP switch settings Testing and Adjustment ProcedureSensitivity knob adjustment PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgInstallation Reference Information, cont’d Page Extron USA West
Related manuals
Manual 18 pages 30.9 Kb Manual 1 pages 17.57 Kb Manual 29 pages 11.77 Kb Manual 46 pages 60.91 Kb