Extron electronic PVS 400, 300 Finish installing the Pole Mount kit, PVS 204SA cable connections

Page 36

Installation — Stage Four, cont’d

4.Finish installing the Pole Mount kit

a.Lift the bottom plate (complete with the PVS 204SA and power supply installed) up to base of the pole and connect the cables as follows:

ACAT 5 cables according to the cable labels

BControl/power cable from the MLC 104 IP Plus

CSpeaker cables

DVGA and ERCA cables

FPower supply cable. Do not apply power yet.

NDo not thread the power cable through the

projector pipe. Threading the power cable through

4

Connect the cables to the switcher

the pipe violates national electrical regulations.

 

 

a

PVT RGB D Input (2 cables, A and B)

RGB #1B

RGB #1A

RGB output to projector

d

VGA Connector

Speaker

To PVS 204SA terminal

Wire color

(Left and Right)

 

 

Red

Positive (+)

 

 

Black

Negative (-)

 

 

Audio output

to speakers

c

4-pole Captive

Screw Connector

CAT 5 cables with RJ-45 connectors

VIDEO

2A

3

 

I

 

 

N

 

POWER

P

 

U

 

 

T

 

 

S

 

12V

1B

2B

3A

 

 

RGB

O

U

T

P

U

T

S

III IIIIII IIIII IIIIII IIIII A024ERD56 E 235411 WO564871-12

PVS 204SA PoleVault Switcher

S/N

 

 

 

LISTED 17TT

 

 

 

AMPLIFIED OUTPUTS

 

 

 

 

 

 

 

®

US AUDIO/VIDEO

 

DO NOT GROUND

 

4/8

 

 

APPARATUS

 

 

OR SHORT

 

 

 

 

 

 

Ohms

Plenum Rated UL 2043

SPEAKER OUTPUTS

 

 

 

Suitable for Use in Air-Handling Spaces

 

 

L

R

 

 

 

 

 

 

 

ON

STEREO

AUX/MIX IN

RS-232 MLC/IR

DC VOL

HIGH

ON

Tx Rx IR

12V

 

 

 

 

 

PASS

 

 

 

 

 

 

 

FILTER

 

 

 

A B

 

 

 

OFF

DUAL

 

 

 

10V

 

MONO

 

 

 

 

VOL/MUTE

 

 

 

 

 

 

2-pole Captive

CAT 5 cable

 

RCA Connector

 

with RJ-45

 

 

Screw Connector

 

 

 

connector

 

e

b

 

 

Tie Wrap

a

 

 

 

 

 

 

#4

Video output

 

 

 

VIDEO

 

 

 

to projector

 

 

 

 

 

f

 

 

 

 

PVT CV D

+12 VDC input

 

 

 

 

Ground (

 

)

Input

 

 

 

 

 

+12 VDC

Ground ( )

Ground ( )

Receive (Rx) B

Transmit (Tx) A

External

Power SupplyMLC104 IP Plus (12 VDC, 3 A max.)

RS-232 input

Power source

5-pole Captive

Screw Connector

MLC Wire

To PVS 204SA

color

terminal

 

 

 

 

 

 

White

A - (Tx on the RS-232 port)

 

 

 

 

 

 

Violet

B - (Rx on the RS-232 port)

 

 

 

 

 

 

Drain wire

 

 

 

 

 

D - Ground

 

 

 

 

 

 

Black

 

 

 

 

 

D - Ground

 

 

 

 

 

 

Red

E - +12 V

 

 

 

 

 

 

PVS 204SA cable connections

2-24 PoleVault Systems Installation • Installation — Stage 4

Image 36
Contents PoleVault Systems Precautions Safety Instructions EnglishConsignes de Sécurité Français Sicherheitsanleitungen DeutschPoleVault Systems Installation Introduction IntroductionFCC Class a Notice PoleVault System installation and wiring overview Introduction, contdTypical classroom installation PoleVault Systems Installation Introduction PlanningRoom layout RoomExample of a classroom installation Introduction Planning, cont’dLocation of the screen and projector ADA overhead and side clearance requirementsExample classroom with four speaker installation Location of MediaLink Controller and Wall PlatesType and location of the speakers Introduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, contd PoleVault System Devices and Hardware, cont’dIntroduction Inventory Overview, cont’d PoleVault System Ceiling SpeakersOptional installation hardware Items not includedInstallation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation Overview Where it goes Screws up into PCM PoleVault Systems Installation Installation StagePCM 240 Projector Ceiling Mount PMP Projector Mounting Pole2c Install the PMP 2d Screw the adjuster plate onto the PMPMark screen location 1a Mark the screen locationInstallation Stage One, cont’d 2f Slide and lock the projector onto the adjuster plateVerify the image location 2e Attach the bracket to the projectorInstallation Using these dimensions, mark and cut a hole forCut the ceiling tile 5d Screw the PMP into the mounting plate viewed from belowSecure the Projector Ceiling Mount to the ceiling Tighten the four T-bar securing screws on the PCM6e Tighten the turnbuckles Install the Screen 6g Attach the safety cable to the PCMPower outlet installation on PCM Stage Two Install the Wall Plates and MLC 104 IP This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller PVS 204SA switcher CablesStage Two Install the Wallplates and MLC 104 IP Plus Install mud rings1d Features for mud ring installation MLC 104 IP Plus mud ringSignal Cable Label color Pull cablesProjector communication cables from 2c Pull the cables at each locationInstallation Stage Two, cont’d Install wall platesInstall MediaLink Controller TWire stripping lengths4a Connecting the MLC to the switcher 4c Connect to the LAN using a CAT 5 cable Connect the MLC to the projector withAn RS-232 cable or IR emitter cable, as AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the PV SI 3C LP Ceiling Speakers PV SI 3C LP Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’d Cable the speakersPole captive screw connector 4c Wire the captive screw connector Dual mono outputStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cableFinish speaker installation 5a Apply putty to speaker grill Stage Four Install the PMK 450 and the PVS 204SA This stage covers installing the devices shown below PVS 204SA PoleVault Switcher PMK 450 Pole Mount KitInstallation Stage Four, cont’d Install the PMK 450 Pole Mount kitSwitcher and projector cable overview Pull the cablesInstall the PVS 204SA switcher PMK 450 bottom plate and secure it using velcro3c Wire the captive screw connector for the power supply 3d Set the DIP switches as desiredFinish installing the Pole Mount kit BControl/power cable from the MLC 104 IP PlusConnect the cables to the switcher PVS 204SA cable connections4d Replace projector on the adjuster plate 4c Attach and screw down rear plateStage Five Configure the System Configure the system1a Load Global Configurator 2 software Launch GC2. Click on Help, then Contents or press F1PoleVault Systems Installation Installation Stage Installation Stage Five, cont’d Loosen all pivot screws and adjust the vertical angle2c Check that an image is present, adjust as needed Test the systemFinal installation Adjust the configuration as necessaryRelease the input button Optional Accessory Installation PPC Installation ProcedureOpen the sensor and loop a wire around the sensor Priority Page Controller included partsStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Testing and Adjustment Procedure Sensitivity knob adjustmentPriority Page Controller Time DIP switch settings PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgInstallation Reference Information, cont’d Page Extron USA West
Related manuals
Manual 18 pages 30.9 Kb Manual 1 pages 17.57 Kb Manual 29 pages 11.77 Kb Manual 46 pages 60.91 Kb