Extron electronic PVS 400, 300, 200 manual Connect the power supply via the PoleVault switcher

Page 44

Optional Accessory Installation — PPC 25

9. If a junction box is being used in a plenum space, ensure the sensor and all wires fit inside the box (as shown at right). All cables leaving the box must be plenum rated. Tighten the cable clamp and secure the lid to the junction box.

9 Ensure the sensor and wires fit completely inside the junction box before attaching the cover

10. Use the included Y-shaped cable assembly to power the Priority Page Controller from the PVS 204SA power supply (as shown). This cable assembly allows both devices to be powered from a single power supply.

Extron

PPC 25

Priority Page

Controller

Extron

PVS 204SA

Twisted Pair

 

Switcher

To Power

 

 

Supply

10Connect the power supply via the PoleVault switcher

2-32 PoleVault Systems Installation • Optional Accessory Installation

Image 44
Contents PoleVault Systems Precautions Safety Instructions EnglishConsignes de Sécurité Français Sicherheitsanleitungen DeutschFCC Class a Notice PoleVault Systems Installation IntroductionIntroduction PoleVault System installation and wiring overview Introduction, contdTypical classroom installation PoleVault Systems Installation Introduction PlanningRoom layout RoomExample of a classroom installation Introduction Planning, cont’dLocation of the screen and projector ADA overhead and side clearance requirementsType and location of the speakers Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Included items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, contd PoleVault System Devices and Hardware, cont’dIntroduction Inventory Overview, cont’d PoleVault System Ceiling SpeakersOptional installation hardware Items not includedInstallation tools PoleVault Systems Installation Installation Overview Installation OverviewOutline of installation steps Where it goes Screws up into PCM PoleVault Systems Installation Installation StagePCM 240 Projector Ceiling Mount PMP Projector Mounting Pole2c Install the PMP 2d Screw the adjuster plate onto the PMPMark screen location 1a Mark the screen locationInstallation Stage One, cont’d 2f Slide and lock the projector onto the adjuster plateVerify the image location 2e Attach the bracket to the projectorInstallation Using these dimensions, mark and cut a hole forCut the ceiling tile 5d Screw the PMP into the mounting plate viewed from below6e Tighten the turnbuckles Secure the Projector Ceiling Mount to the ceilingTighten the four T-bar securing screws on the PCM Power outlet installation on PCM Install the Screen6g Attach the safety cable to the PCM MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IPThis stage involves installing the devices shown below PVS 204SA switcher CablesStage Two Install the Wallplates and MLC 104 IP Plus Install mud rings1d Features for mud ring installation MLC 104 IP Plus mud ringSignal Cable Label color Pull cablesProjector communication cables from 2c Pull the cables at each locationInstallation Stage Two, cont’d Install wall plates4a Connecting the MLC to the switcher Install MediaLink ControllerTWire stripping lengths 4c Connect to the LAN using a CAT 5 cable Connect the MLC to the projector withAn RS-232 cable or IR emitter cable, as AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the PV SI 3C LP Ceiling Speakers PV SI 3C LP Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’d Cable the speakersPole captive screw connector 4c Wire the captive screw connector Dual mono outputStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cableFinish speaker installation 5a Apply putty to speaker grillStage Four Install the PMK 450 and the PVS 204SA This stage covers installing the devices shown belowPVS 204SA PoleVault Switcher PMK 450 Pole Mount KitInstallation Stage Four, cont’d Install the PMK 450 Pole Mount kitSwitcher and projector cable overview Pull the cablesInstall the PVS 204SA switcher PMK 450 bottom plate and secure it using velcro3c Wire the captive screw connector for the power supply 3d Set the DIP switches as desiredFinish installing the Pole Mount kit BControl/power cable from the MLC 104 IP PlusConnect the cables to the switcher PVS 204SA cable connections4d Replace projector on the adjuster plate 4c Attach and screw down rear plateStage Five Configure the System Configure the system1a Load Global Configurator 2 software Launch GC2. Click on Help, then Contents or press F1PoleVault Systems Installation Installation Stage Installation Stage Five, cont’d Loosen all pivot screws and adjust the vertical angle2c Check that an image is present, adjust as needed Test the system Release the input button Final installation Adjust the configuration as necessary Optional Accessory Installation PPC Installation ProcedureOpen the sensor and loop a wire around the sensor Priority Page Controller included partsStrip 3/16 of insulation from each conductor on the bare Connect the power supply via the PoleVault switcher Priority Page Controller Time DIP switch settings Testing and Adjustment ProcedureSensitivity knob adjustment PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgInstallation Reference Information, cont’d Page Extron USA West