Contents
PoleVault Systems
Consignes de Sécurité Français
Precautions
Safety Instructions English
Sicherheitsanleitungen Deutsch
FCC Class a Notice
PoleVault Systems Installation Introduction
Introduction
PoleVault System installation and wiring overview
Introduction, contd
Room layout
Typical classroom installation
PoleVault Systems Installation Introduction Planning
Room
Location of the screen and projector
Example of a classroom installation
Introduction Planning, cont’d
ADA overhead and side clearance requirements
Type and location of the speakers
Example classroom with four speaker installation
Location of MediaLink Controller and Wall Plates
Included items
Introduction Inventory Overview
Inventory
PoleVault System Devices and Hardware, contd
PoleVault System Devices and Hardware, cont’d
Introduction Inventory Overview, cont’d
PoleVault System Ceiling Speakers
Optional installation hardware
Items not included
Installation tools
PoleVault Systems Installation Installation Overview
Installation Overview
Outline of installation steps
PCM 240 Projector Ceiling Mount
Where it goes Screws up into PCM
PoleVault Systems Installation Installation Stage
PMP Projector Mounting Pole
Mark screen location
2c Install the PMP
2d Screw the adjuster plate onto the PMP
1a Mark the screen location
Verify the image location
Installation Stage One, cont’d
2f Slide and lock the projector onto the adjuster plate
2e Attach the bracket to the projector
Cut the ceiling tile
Installation
Using these dimensions, mark and cut a hole for
5d Screw the PMP into the mounting plate viewed from below
6e Tighten the turnbuckles
Secure the Projector Ceiling Mount to the ceiling
Tighten the four T-bar securing screws on the PCM
Power outlet installation on PCM
Install the Screen
6g Attach the safety cable to the PCM
MLC 104 IP Plus MediaLink Controller
Stage Two Install the Wall Plates and MLC 104 IP
This stage involves installing the devices shown below
PVS 204SA switcher
Cables
1d Features for mud ring installation
Stage Two Install the Wallplates and MLC 104 IP Plus
Install mud rings
MLC 104 IP Plus mud ring
Projector communication cables from
Signal Cable Label color
Pull cables
2c Pull the cables at each location
Installation Stage Two, cont’d
Install wall plates
4a Connecting the MLC to the switcher
Install MediaLink Controller
TWire stripping lengths
An RS-232 cable or IR emitter cable, as
4c Connect to the LAN using a CAT 5 cable
Connect the MLC to the projector with
Appropriate
Connections made to the MLC 104 IP Plus
4e Secure the MLC 104 IP Plus to the mud ring
Stage Three Install the PV SI 3C LP Ceiling Speakers
PV SI 3C LP Ceiling Speakers
Cut ceiling tile
Installation Stage Three, cont’d
Cable the speakers
Stereo or dual mono output using parallel speaker wiring
Pole captive screw connector
4c Wire the captive screw connector Dual mono output
To terminate the cable, strip the end of the cable
Finish speaker installation
5a Apply putty to speaker grill
PVS 204SA PoleVault Switcher
Stage Four Install the PMK 450 and the PVS 204SA
This stage covers installing the devices shown below
PMK 450 Pole Mount Kit
Switcher and projector cable overview
Installation Stage Four, cont’d
Install the PMK 450 Pole Mount kit
Pull the cables
3c Wire the captive screw connector for the power supply
Install the PVS 204SA switcher
PMK 450 bottom plate and secure it using velcro
3d Set the DIP switches as desired
Connect the cables to the switcher
Finish installing the Pole Mount kit
BControl/power cable from the MLC 104 IP Plus
PVS 204SA cable connections
4d Replace projector on the adjuster plate
4c Attach and screw down rear plate
1a Load Global Configurator 2 software
Stage Five Configure the System
Configure the system
Launch GC2. Click on Help, then Contents or press F1
PoleVault Systems Installation Installation Stage
2c Check that an image is present, adjust as needed
Installation Stage Five, cont’d
Loosen all pivot screws and adjust the vertical angle
Test the system
Release the input button
Final installation
Adjust the configuration as necessary
Open the sensor and loop a wire around the sensor
Optional Accessory Installation PPC
Installation Procedure
Priority Page Controller included parts
Strip 3/16 of insulation from each conductor on the bare
Connect the power supply via the PoleVault switcher
Priority Page Controller Time DIP switch settings
Testing and Adjustment Procedure
Sensitivity knob adjustment
PoleVault Systems Installation Reference Information
Reference Information
Wall or furniture mountable with included Decora wall plate
Lbs 0.1 kg
Installation Reference Information, cont’d
Page
Extron USA West