Sierra 241-VTP, 240-VTP instruction manual Flow Meter with Removable Insertion Tool

Page 28

Chapter 2 Installation

Series 24-HP Instruction Manual

 

 

Insertion Procedure for Flow Meters with Removable Insertion Tool

Caution!

The sensor alignment pointer must point downstream, in the direction of flow.

Note

If line pressure is above 500 psig, it could require up to 25 ft lb of torque to insert the flow meter.

Do not confuse this with possible interference in the pipe.

Figure 2-10. Flow Meter with Removable Insertion Tool

1.Calculate the required sensor probe insertion length. Measure from the depth marker arrow down the stanchion and scribe a mark at the calculated insertion depth.

2.Fully retract the flow meter until the sensor head is touching the bot- tom of the stem housing. Attach the meter assembly to the two inch full-port isolation valve, if used. Use Teflon tape or pipe sealant to improve seal and prevent seizing on NPT style.

3.Remove the two top stem clamp nuts and loosen two stem clamp bolts. Slide the stem clamp away to expose the packing gland nuts.

4.Loosen the two packing gland nuts. Loosen the stem lock bolt adja- cent to the sensor alignment pointer. Align the sensor head using the sensor alignment pointer. Adjust the alignment pointer parallel to the pipe and pointing downstream. Tighten the stem lock bolt to secure the sensor position.

5.Slowly open the isolation valve to the full open position. If necessary, slightly tighten the two packing gland nuts to reduce the leakage around the stem.

6.Turn the insertion tool handle clockwise to insert the stem into the pipe. Continue until the top of the upper retractor bracket lines up with the insertion length mark scribed on the stanchion. Do not force the stem into the pipe.

2-14

IM-24-HP

Image 28
Contents Models 240-VT, 240-VTP, 241-VT, 241-VTP Customer Notice Copyright Sierra InstrumentsTable of Contents Troubleshooting and Repair Figures TablesTable of Contents Introduction Using This ManualInnova-MassMulti-Parameter Vortex Mass Flow Meters Receipt of System Components Technical AssistanceHow the Innova-Mass Vortex Mass Flow Meter Operates Velocity MeasurementVortex Shedding Frequency Vortex Frequency SensingFlow Velocity Range Gas LiquidTemperature Measurement Reynolds Number Range for the Innova-MassFlow Meter Configurations Pressure MeasurementFlow Meter Electronics Installation Overview InstallationFlow Meter Installation Requirements Unobstructed Flow Requirements Series 240 In-Line Flow Meter Installation Flange Bolt SpecificationsWafer-Style Flow Meter Installation Wafer-Style Flow Meter InstallationFlange-Style Flow Meter Installation Flange-Style Flow Meter InstallationMounting Position Series 241 Insertion Flow Meter InstallationIsolation Valve Selection Cold Tap Guidelines Hot Tap Guidelines FlowFlow Meter Insertion Use the Correct Insertion FormulaInstalling Flow Meters with a Compression Connection ExampleInsertion Procedure for Meters with a Compression Connection Example 1 Flange Style Meters Installing Flow Meters with a Packing Gland ConnectionExample 2 NPT Style Meters Flow Meter with Permanent Insertion Tool 10. Flow Meter with Removable Insertion Tool 11. Insertion Calculation Meters without Insertion Tool Installation Adjusting Meter Orientation Display/Keypad Adjustment All MetersEnclosure Adjustment Series 240 Only 13. Enclosure Viewing AdjustmentWiring Connections Input Power ConnectionsAC Power Wiring DC Power WiringMA Output Connections 16. Load Resistance Versus Input VoltagePulse Output Connections 20. Isolated Pulse Output with External Power Supply Alarm Output Connections 23. Isolated Alarm Output with External Power SupplyRemote Electronics Wiring 25. Isolated Alarm Output Using Meter Provided Power SupplyOptional Input Electronics Wiring Optional Energy EMS Input Electronics WiringPage Flow Meter Display/Keypad Operating InstructionsSierra Run Mode Screens Start-UpUsing the Setup Menus Programming the Flow MeterOutput Menu TimeConstSec XxxxExample for Setting an Output First, set the desired units of measurementExample for Changing a Run Mode Display Item Display MenuAlarms Menu Example for Setting an AlarmExample for Setting the Totalizer Totalizer #1 MenuTotalizer #2 Menu Configuration Energy Menu For EMS Energy Meters OnlyFluid Menu Units Menu Example for Setting the Time Time & Date MenuDiagnostics Menu Calibration Menu Password Menu Troubleshooting and Repair Hidden Diagnostics MenusColumn One Hidden Diagnostics Values IM-24-HP A2D Ref. Resistor = Factory Use Only Analog Output Calibration Troubleshooting the Flow Meter Symptom Output at no Flow Symptom No Output Symptom Meter Displays Temperature Fault Electronics Assembly Replacement All Meters Pressure Sensor Replacement Appendix a Product Specifications Appendix a Specifications Appendix a Specifications Cnpt IP66, Nema Page Appendix B Glossary C DK L S T Page Appendix C Fluid Calculations Calculations for Steam T & PDensity ViscosityCalculations for Gas Real Gas and Other Gas Density for real gases is calculated from the equationCalculations for Liquid Page Appendix D Hart Commands with DD Menu PV AOAppendix D Hart Commands without DD Menu PV AO PV LRV URVAppendix E Modbus Communication Applicable Flow Meter ModelsModbus Order Register Definitions Appendix E Modbus Commands Following registers contain the display units strings Control Register Definitions Examples An attempt to read registers that don’t exist 8C 3A CRC not the correct CRC EJS-02-06-07 Appendix E Modbus Commands