Sierra 241-VTP, 240-VTP Series 241 Insertion Flow Meter Installation, Mounting Position

Page 20

Chapter 2 Installation

Series 24-HP Instruction Manual

 

 

Series 241 Insertion Flow Meter Installation

Prepare the pipeline for installation using either a cold tap or hot tap method described on the following pages. Refer to a standard code for all pipe tapping operations. The following tapping instructions are general in nature and intended for guideline purposes only. Before installing the me- ter, review the mounting position and isolation value requirements given below.

Mounting Position

Allow clearance between the electronics enclosure top and any other ob- struction when the meter is fully retracted.

Isolation Valve Selection

An isolation valve is available as an option with Series 241 meters. If you supply the isolation valve, it must meet the following requirements:

1.A minimum valve bore di- ameter of 1.875 inches is re- quired, and the valve’s body size should be two inches. Normally, gate valves are used.

2.Verify that the valve’s body and flange rating are within the flow meter’s maximum operating pressure and tem- perature.

1.875-inch min.

valve bore

2-inch min.

2-inch

valve size

Isolation Valve Requirements

3.Choose an isolation valve with at least two inches existing between the flange face and the gate portion of the valve. This ensures that the flow meter’s sensor head will not interfere with the operation of the isolation valve.

2-6

IM-24-HP

Image 20
Contents Models 240-VT, 240-VTP, 241-VT, 241-VTP Customer Notice Copyright Sierra InstrumentsTable of Contents Troubleshooting and Repair Figures TablesTable of Contents Innova-MassMulti-Parameter Vortex Mass Flow Meters Using This ManualIntroduction Receipt of System Components Technical AssistanceHow the Innova-Mass Vortex Mass Flow Meter Operates Velocity MeasurementVortex Shedding Frequency Vortex Frequency SensingFlow Velocity Range Gas LiquidTemperature Measurement Reynolds Number Range for the Innova-MassFlow Meter Configurations Pressure MeasurementFlow Meter Electronics Flow Meter Installation Requirements InstallationInstallation Overview Unobstructed Flow Requirements Series 240 In-Line Flow Meter Installation Flange Bolt SpecificationsWafer-Style Flow Meter Installation Wafer-Style Flow Meter InstallationFlange-Style Flow Meter Installation Flange-Style Flow Meter InstallationIsolation Valve Selection Series 241 Insertion Flow Meter InstallationMounting Position Cold Tap Guidelines Hot Tap Guidelines FlowFlow Meter Insertion Use the Correct Insertion FormulaInstalling Flow Meters with a Compression Connection ExampleInsertion Procedure for Meters with a Compression Connection Example 2 NPT Style Meters Installing Flow Meters with a Packing Gland ConnectionExample 1 Flange Style Meters Flow Meter with Permanent Insertion Tool 10. Flow Meter with Removable Insertion Tool 11. Insertion Calculation Meters without Insertion Tool Installation Adjusting Meter Orientation Display/Keypad Adjustment All MetersEnclosure Adjustment Series 240 Only 13. Enclosure Viewing AdjustmentWiring Connections Input Power ConnectionsAC Power Wiring DC Power WiringMA Output Connections 16. Load Resistance Versus Input VoltagePulse Output Connections 20. Isolated Pulse Output with External Power Supply Alarm Output Connections 23. Isolated Alarm Output with External Power SupplyRemote Electronics Wiring 25. Isolated Alarm Output Using Meter Provided Power SupplyOptional Input Electronics Wiring Optional Energy EMS Input Electronics WiringPage Sierra Operating InstructionsFlow Meter Display/Keypad Run Mode Screens Start-UpUsing the Setup Menus Programming the Flow MeterOutput Menu TimeConstSec XxxxExample for Setting an Output First, set the desired units of measurementExample for Changing a Run Mode Display Item Display MenuAlarms Menu Example for Setting an AlarmExample for Setting the Totalizer Totalizer #1 MenuTotalizer #2 Menu Configuration Energy Menu For EMS Energy Meters OnlyFluid Menu Units Menu Example for Setting the Time Time & Date MenuDiagnostics Menu Calibration Menu Password Menu Troubleshooting and Repair Hidden Diagnostics MenusColumn One Hidden Diagnostics Values IM-24-HP A2D Ref. Resistor = Factory Use Only Analog Output Calibration Troubleshooting the Flow Meter Symptom Output at no Flow Symptom No Output Symptom Meter Displays Temperature Fault Electronics Assembly Replacement All Meters Pressure Sensor Replacement Appendix a Product Specifications Appendix a Specifications Appendix a Specifications Cnpt IP66, Nema Page Appendix B Glossary C DK L S T Page Appendix C Fluid Calculations Calculations for Steam T & PDensity ViscosityCalculations for Gas Real Gas and Other Gas Density for real gases is calculated from the equationCalculations for Liquid Page Appendix D Hart Commands with DD Menu PV AOAppendix D Hart Commands without DD Menu PV AO PV LRV URVAppendix E Modbus Communication Applicable Flow Meter ModelsModbus Order Register Definitions Appendix E Modbus Commands Following registers contain the display units strings Control Register Definitions Examples An attempt to read registers that don’t exist 8C 3A CRC not the correct CRC EJS-02-06-07 Appendix E Modbus Commands