Enterasys Networks
2G4082-25, 9034310-01
manual
Lanview Diagnostic LEDs Introduction
Troubleshooting
Specs
Install
Connecting to the Network
Lanview Diagnostic LEDs
Recommended Shutdown Procedure
Setting the Mode Switches
How to
What is
Page 22
LANVIEW Diagnostic LEDs
1-6
Introduction
Page 21
Page 23
Image 22
Page 21
Page 23
Contents
Enterasys Matrix
Page
Page
Regulatory Compliance Information
Electromagnetic Compatibility EMC
Supplement to Product Instructions
Vcci Notice
Enterasys NETWORKS, INC. Firmware License Agreement
Vii
Viii
Contents
Index
Appendix a Specifications
Tables
Who Should Use This Guide
About This Guide
Important Notice
How to Use This Guide
Related Documents
Conventions Used in This Guide
Getting Help
Getting Help
Introduction
Overview of DFE Series Capabilities
DFE-Platinum Module
2G4082-25
DFE
Network Expansion Module NEM Option
Switch Configuration Using WebView
Switch Configuration Using CLI Commands
Connectivity
Secure Networks Policy Support
Lanview Diagnostic LEDs
Standards Compatibility
Lanview Diagnostic LEDs Introduction
Network Requirements
Link Aggregation
1000BASE-T Network
10BASE-T Network
100BASE-TX Network
1000BASE-SX/LX/ELX Network
Installation
Installing Module into Matrix E7 or N7 Chassis
Installing Optional Network Expansion Modules
Unpacking the DFE-Platinum Module
Installation
Preparation
Card guides
Installing Module into Matrix N1, N3, or N5 Chassis
Connecting to the Network
Connecting UTP Cables
Connecting a Twisted Pair Segment to the DFE-Platinum Module
RX+
TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4
What Is Needed
Connecting to COM Port for Local Management
Connecting to an IBM PC or Compatible Device
Connecting to a VT Series Terminal
Connecting an IBM PC or Compatible
Connecting to a Modem
Connecting a VT Series Terminal
Adapter Wiring and Signal Assignments
DB9
Modem Port Adapter Wiring and Signal Diagram
Completing the Installation of a New System
First-Time Log-In Using a Console Port Connection
Logging in with an Administratively-Configured User Account
11 Matrix DFE Startup Screen Example N7 Chassis
About the Management Mgmt LED
Troubleshooting
Using Lanview
Viewing the Receive and Transmit Activity
LED
Alternating 67% on, 33% off
Troubleshooting Checklist
Series Configuration Guide for proper setup
Overview of DFE-Platinum Module Shutdown Procedure
Recommended Shutdown Procedure
Specifications
DFE-Platinum Module Specifications
COM Port Pinout Assignments
Regulatory Compliance
Setting the Mode Switches
Mode Switch Bank Settings Optional Installations
Required Tools
Memory Locations and Replacement Procedures
Figure B-1 Mode Switch Location on 2G4082-25
Location of Memory Modules
Flash Dimm Replacement Procedure
Removing the Dimm from 2G4082-25
Figure B-3 NEM Removal and Dimm Connector Location
Installing the Dimm
Dimm
Installing the Dram Simm
Dram Simm Replacement Procedure
Removing the Dram Simm
Figure B-7 Installing the Dram Simm
Page
Index
Numerics
Index-2
Related pages
All Diagnostic page
Dell embedded system diagnostics for Dell T630
Register Nuntler Current Diagnostic Test for Mitel SX-50
Extended Diagnostics for Paradyne 392xPLUS
Dell Diagnostics Main Menu for Dell PP19L
OnDiagnostics Secure Standby for Sun Microsystems 2000E
Diagnostic Programs Peripheral for Toshiba M40
DiagnosticsB-7 for Motorola DTC700
Cannot run or submit a diagnostic report for Blackberry 8900
Computer Setup Bios and Advanced System Diagnostics for HP mt40 Mobile
Diagnostic du système for Avocent 2000
Can I connect the SCX-4828FN via USB?
Find the connection options
Top
Page
Image
Contents