Enterasys Networks 9034310-01, 2G4082-25 manual Adapter Wiring and Signal Assignments, DB9

Page 37

Pin Out Descriptions

Connecting to COM Port for Local Management

Figure 3-10 Connecting to a Modem

1X

G

R

O

U

P

1

11X

Å

Ä

Ã

Â

À

Gb ENET

2G4082-25

OFFLINE/

RESET

COM

MGMT CPU Á

GROUP

SELECT

GROUP

1 1

2 2

3

4

5

6

7

8

9 10

12X

11

12

1

UTP straight-through cable with RJ45 connectors

4

Local modem

2

RJ45 COM port

5

Remote modem

3

RJ45-to-DB25 modem adapter

6

Remote PC

Adapter Wiring and Signal Assignments

COM Port Adapter Wiring and Signal Diagram

RJ45

 

DB9

 

 

Pin

Conductor

Pin

Signal

 

1

Blue

2

Receive (RX)

4

Red

3

Transmit (TX)

5

Green

5

Ground (GRD)

2

Orange

7

Request to Send (RTS)

6

Yellow

8

Clear to Send (CTS)

 

Pins

 

Pins

 

1

8

 

5

1

RJ45 Connector (Female)

 

9

6

 

 

 

DB9 Connector

(Female)

Matrix DFE-Platinum Series Installation Guide 3-13

Image 37
Contents Enterasys Matrix Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Enterasys NETWORKS, INC. Firmware License Agreement Vii Viii Contents Index Appendix a SpecificationsTables Who Should Use This Guide About This GuideImportant Notice Related Documents How to Use This GuideGetting Help Conventions Used in This GuideGetting Help Overview of DFE Series Capabilities Introduction2G4082-25 DFE-Platinum ModuleDFE Switch Configuration Using CLI Commands Switch Configuration Using WebViewNetwork Expansion Module NEM Option ConnectivitySecure Networks Policy Support Lanview Diagnostic LEDsStandards Compatibility Lanview Diagnostic LEDs Introduction Link Aggregation Network Requirements100BASE-TX Network 10BASE-T Network1000BASE-T Network 1000BASE-SX/LX/ELX NetworkInstallation Installing Module into Matrix E7 or N7 Chassis Installing Optional Network Expansion ModulesUnpacking the DFE-Platinum Module Preparation InstallationCard guides Installing Module into Matrix N1, N3, or N5 Chassis Connecting UTP Cables Connecting to the NetworkConnecting a Twisted Pair Segment to the DFE-Platinum Module RX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 What Is Needed Connecting to COM Port for Local ManagementConnecting to an IBM PC or Compatible Device Connecting an IBM PC or Compatible Connecting to a VT Series TerminalConnecting a VT Series Terminal Connecting to a ModemDB9 Adapter Wiring and Signal AssignmentsModem Port Adapter Wiring and Signal Diagram First-Time Log-In Using a Console Port Connection Completing the Installation of a New System11 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User AccountUsing Lanview TroubleshootingAbout the Management Mgmt LED Viewing the Receive and Transmit ActivityLED Alternating 67% on, 33% off Series Configuration Guide for proper setup Troubleshooting ChecklistOverview of DFE-Platinum Module Shutdown Procedure Recommended Shutdown Procedure DFE-Platinum Module Specifications SpecificationsRegulatory Compliance COM Port Pinout AssignmentsSetting the Mode Switches Mode Switch Bank Settings Optional InstallationsRequired Tools Figure B-1 Mode Switch Location on 2G4082-25 Memory Locations and Replacement ProceduresLocation of Memory Modules Flash Dimm Replacement ProcedureRemoving the Dimm from 2G4082-25 Figure B-3 NEM Removal and Dimm Connector Location Dimm Installing the DimmInstalling the Dram Simm Dram Simm Replacement ProcedureRemoving the Dram Simm Figure B-7 Installing the Dram Simm Page Numerics IndexIndex-2