Enterasys Networks 2G4082-25, 9034310-01 manual Unpacking the DFE-Platinum Module

Page 26

Unpacking the DFE-Platinum Module

Unpacking the DFE-Platinum Module

Unpack the DFE‐Platinum module as follows:

1.Open the box and remove the packing material protecting the DFE‐Platinum module.

2.Verify the contents of the carton as listed in Table 3‐1.

Table 3-1 Contents of DFE-Platinum Module Carton

Item

Quantity

 

 

DFE-Platinum Module (2G4082-25)

1

 

 

This Installation Guide

1

 

 

Customer Release Notes

1

 

 

3.Remove the tape seal on the non‐conductive bag to remove the DFE module.

4.Perform a visual inspection of the DFE‐Platinum module for any signs of physical damage. Contact Enterasys Networks if there are any signs of damage. Refer to “Getting Help” on page xiii for details.

Installing Optional Network Expansion Modules

Note: Install any optional equipment before installing the 2G4082-25 into a chassis.

A Phillips screwdriver is needed to install an optional NEM into the 2G4082‐25.

At the time of this printing, only the 7G‐6MGBIC‐A NEM is available for the 2G4082‐25. Refer to your release notes for the latest available Ethernet interface modules. The 7G‐6MGBIC‐A provides six Gigabit port slots for optional Mini‐GBIC connections.

Installing an optional NEM involves

removing the coverplate from the DFE‐Platinum module,

attaching the NEM to the DFE‐Platinum module, and

if required, installing Mini‐GBICs.

For more information, refer to the Quick Reference that was shipped with your NEM, or the Matrix Network Expansion Module Hardware Installation Guide located on the Enterasys Networks website.

Installing Module into Matrix E7 or N7 Chassis

Caution: Failure to observe static safety precautions could cause damage to the DFE module. Follow static safety handling rules and wear the antistatic wrist strap.

Do not cut the non-conductive bag to remove the module. Sharp objects contacting the board or components can cause damage.

Precaución: Si no toma las medidas de seguridad necesarias para evitar descargas de electricidad estática, es posible que el módulo se dañe. Siga los consejos de seguridad para la manipulación del producto y no olvide utilizar la pulsera antiestática.

No corte la bolsa antiestática para sacar el módulo. Tenga en cuenta que si algún objeto cortante entra en contacto con la placa o con los componentes, éstos podrían dañarse.

To install a 2G4082‐25 into a Matrix E7 or Matrix N7 chassis, proceed directly to “Preparation” on page 3‐3 to start the installation process.

3-2 Installation

Image 26 Contents
Enterasys Matrix Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Enterasys NETWORKS, INC. Firmware License Agreement Vii Viii Contents Tables Appendix a SpecificationsIndex Important Notice About This GuideWho Should Use This Guide How to Use This Guide Related DocumentsConventions Used in This Guide Getting HelpGetting Help Introduction Overview of DFE Series CapabilitiesDFE-Platinum Module 2G4082-25DFE Network Expansion Module NEM Option Switch Configuration Using WebViewSwitch Configuration Using CLI Commands ConnectivityStandards Compatibility Lanview Diagnostic LEDsSecure Networks Policy Support Lanview Diagnostic LEDs Introduction Network Requirements Link Aggregation1000BASE-T Network 10BASE-T Network100BASE-TX Network 1000BASE-SX/LX/ELX NetworkInstallation Unpacking the DFE-Platinum Module Installing Optional Network Expansion ModulesInstalling Module into Matrix E7 or N7 Chassis Installation PreparationCard guides Installing Module into Matrix N1, N3, or N5 Chassis Connecting to the Network Connecting UTP CablesConnecting a Twisted Pair Segment to the DFE-Platinum Module RX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting to an IBM PC or Compatible Device Connecting to COM Port for Local ManagementWhat Is Needed Connecting to a VT Series Terminal Connecting an IBM PC or CompatibleConnecting to a Modem Connecting a VT Series TerminalAdapter Wiring and Signal Assignments DB9Modem Port Adapter Wiring and Signal Diagram Completing the Installation of a New System First-Time Log-In Using a Console Port ConnectionLogging in with an Administratively-Configured User Account 11 Matrix DFE Startup Screen Example N7 ChassisAbout the Management Mgmt LED TroubleshootingUsing Lanview Viewing the Receive and Transmit ActivityLED Alternating 67% on, 33% off Troubleshooting Checklist Series Configuration Guide for proper setupOverview of DFE-Platinum Module Shutdown Procedure Recommended Shutdown Procedure Specifications DFE-Platinum Module SpecificationsCOM Port Pinout Assignments Regulatory ComplianceRequired Tools Mode Switch Bank Settings Optional InstallationsSetting the Mode Switches Memory Locations and Replacement Procedures Figure B-1 Mode Switch Location on 2G4082-25Removing the Dimm from 2G4082-25 Flash Dimm Replacement ProcedureLocation of Memory Modules Figure B-3 NEM Removal and Dimm Connector Location Installing the Dimm DimmRemoving the Dram Simm Dram Simm Replacement ProcedureInstalling the Dram Simm Figure B-7 Installing the Dram Simm Page Index NumericsIndex-2
Related manuals
Manual 58 pages 25.55 Kb