Enterasys Networks 9034310-01, 2G4082-25 manual Preparation, Installation

Page 27

Installing Module into Matrix E7 or N7 Chassis

Preparation

1.Remove the blank panel covering the module slot in which the module will be installed. All other slots must remain covered to ensure proper airflow for cooling. (Save the blank plate in the event you need to remove the module.)

2.Remove the module from the shipping box. (Save the box and packing materials in the event the module needs to be reshipped.)

3.Locate the antistatic wrist strap shipped with the chassis. Attach the antistatic wrist strap to your wrist and plug the cable from the antistatic wrist strap into the ESD grounding receptacle at the upper right corner of the chassis.

4.Remove the module from the plastic bag. (Save the bag in the event the module must be reshipped.) Observe all precautions to prevent damage from Electrostatic Discharge (ESD).

5.Examine the module for damage. If any damage exists, DO NOT install the module. Immediately contact Enterasys Networks. Refer to “Getting Help” on page xiii.

Installation

Note: The DFE-Platinum 2G4082-25 module can be installed in the single-slot of the Matrix N1 chassis, or in any slot of the Matrix E7, Matrix N7, Matrix N5, or Matrix N3, but does not have FTM connectivity.

When installed in the Matrix E7, Matrix N7, Matrix N5, or Matrix N3, the 2G4082-25 will boot as a standalone device with no connectivity to other modules in the chassis.

To install the module in the Matrix E7 or Matrix N7, refer to Figure 3‐1 and proceed as follows:

Caution: To prevent damaging the backplane connectors in the following step, take care that the module slides in straight and properly engages the backplane connectors.

Ensure that the top lever lines up with the desired slot number located on the front panel of the chassis. Refer to Figure 3-1.

Precaución: Para evitar que se dañen los conectores del panel posterior en el siguiente paso, intente deslizar el módulo en forma recta y verifique que se enganche correctamente en los conectores de panel posterior.

Asegúrese de que la palanca superior esté alineada con respecto al número de ranura correspondiente ubicado en el panel frontal del chasis. Consulte en Figure 3-1.

1.Locate the chassis card guides that line up with the slot number in which the module will be installed. (In this example, slot 1 is being used.) Make sure the module locking levers are in the open position (top and bottom).

2.Align the module card between the upper and lower card guides of the desired slot and slide it into the chassis, taking care that the module slides in straight. See Caution below.

Caution: Due to the amount of force needed to properly seat the module connectors into the backplane connectors, it is best to apply force to the end of the levers to insert (or eject) the module. Otherwise, damage could result to the module and chassis.

Precaución: Para colocar los conectores del módulo en los conectores del panel posterior correctamente es necesario hacer bastante fuerza, por ello, para insertar o quitar el módulo, se recomienda concentrar la fuerza en el extremo de las palancas. Si no lo hace, podría dañar el módulo y el chasis.

3.Slide the module into the slot until you can engage the top and bottom locking levers with the chassis as shown in Figure 3‐1.

Matrix DFE-Platinum Series Installation Guide 3-3

Image 27
Contents Enterasys Matrix Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Enterasys NETWORKS, INC. Firmware License Agreement Vii Viii Contents Appendix a Specifications IndexTables About This Guide Who Should Use This GuideImportant Notice Related Documents How to Use This GuideGetting Help Conventions Used in This GuideGetting Help Overview of DFE Series Capabilities Introduction2G4082-25 DFE-Platinum ModuleDFE Connectivity Switch Configuration Using WebViewSwitch Configuration Using CLI Commands Network Expansion Module NEM OptionLanview Diagnostic LEDs Secure Networks Policy SupportStandards Compatibility Lanview Diagnostic LEDs Introduction Link Aggregation Network Requirements1000BASE-SX/LX/ELX Network 10BASE-T Network100BASE-TX Network 1000BASE-T NetworkInstallation Installing Optional Network Expansion Modules Installing Module into Matrix E7 or N7 ChassisUnpacking the DFE-Platinum Module Preparation InstallationCard guides Installing Module into Matrix N1, N3, or N5 Chassis Connecting UTP Cables Connecting to the NetworkConnecting a Twisted Pair Segment to the DFE-Platinum Module RX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting to COM Port for Local Management What Is NeededConnecting to an IBM PC or Compatible Device Connecting an IBM PC or Compatible Connecting to a VT Series TerminalConnecting a VT Series Terminal Connecting to a ModemDB9 Adapter Wiring and Signal AssignmentsModem Port Adapter Wiring and Signal Diagram First-Time Log-In Using a Console Port Connection Completing the Installation of a New System11 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User AccountViewing the Receive and Transmit Activity TroubleshootingUsing Lanview About the Management Mgmt LEDLED Alternating 67% on, 33% off Series Configuration Guide for proper setup Troubleshooting ChecklistOverview of DFE-Platinum Module Shutdown Procedure Recommended Shutdown Procedure DFE-Platinum Module Specifications SpecificationsRegulatory Compliance COM Port Pinout AssignmentsMode Switch Bank Settings Optional Installations Setting the Mode SwitchesRequired Tools Figure B-1 Mode Switch Location on 2G4082-25 Memory Locations and Replacement ProceduresFlash Dimm Replacement Procedure Location of Memory ModulesRemoving the Dimm from 2G4082-25 Figure B-3 NEM Removal and Dimm Connector Location Dimm Installing the DimmDram Simm Replacement Procedure Installing the Dram SimmRemoving the Dram Simm Figure B-7 Installing the Dram Simm Page Numerics IndexIndex-2