Enterasys Networks 9034310-01 manual Connecting a Twisted Pair Segment to the DFE-Platinum Module

Page 31

Connecting to the Network

Figure 3‐3 shows connecting a twisted pair segment to the 2G4082‐25 module. It is assumed that the chassis power is turned on to provide power to the module. Refer to Figure 3‐3 and proceed as follows:

1.Ensure that the device connected to the other end of the segment is powered ON.

2.Connect the twisted pair segment to the module by inserting the RJ45 connector on the twisted pair segment into the appropriate RJ45 port connector.

Figure 3-3 Connecting a Twisted Pair Segment to the DFE-Platinum Module

Gb ENET

2G4082-25

Á À

1

11X

OFFLINE/

RESET

COM

MGMT

CPU

Â

 

GROUP

 

 

SELECT

 

GROUP

1 1

2 2

3

4

5

6

7

8

9 10

12X

11

12

RX

TX

1 RJ45 connector

2 RJ45 port connector (port 1)

3 GROUP SELECT button

3.Verify that a link exists by checking that the port RX (Receive) LED is ON (flashing amber, blinking green, or solid green). If the RX LED is OFF and the TX (Transmit) LED is not blinking amber, perform the following steps until it is on:

a.To view the receive and transmit activity on a group of segments, press the GROUP SELECT button (see Figure 3‐3) to step to the group of interest (Groups 1 and 2). Each time the GROUP SELECT button is pressed, the GROUP LED lights up in sequence, indicating which Group is selected. The receive and transmit activity for that group of segments is then indicated by the RX and TX LEDs for each segment.

b.Verify that the cabling being used is Category 5 UTP with an impedance between 85 and 111 ohms. For the port to operate at 100 or 1000 Mbps, Category 5 cabling must be used and installed properly.

c.Verify that the device at the other end of the twisted pair segment is on and properly connected to the segment.

d.Verify that the RJ45 connectors on the twisted pair segment have the proper pinouts and check the cable for continuity. Typically, a crossover cable is used between hub devices. A straight‐through cable is used to connect between switches or hub devices and an end user (computer). Refer to Figure 3‐4 and Figure 3‐5 for four‐wire RJ45 connections. Refer to Figure 3‐6 and Figure 3‐7 for eight‐wire RJ45 connections.

Matrix DFE-Platinum Series Installation Guide 3-7

Image 31
Contents Enterasys Matrix Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Enterasys NETWORKS, INC. Firmware License Agreement Vii Viii Contents Index Appendix a SpecificationsTables Who Should Use This Guide About This GuideImportant Notice Related Documents How to Use This GuideGetting Help Conventions Used in This GuideGetting Help Overview of DFE Series Capabilities Introduction2G4082-25 DFE-Platinum ModuleDFE Connectivity Switch Configuration Using WebViewSwitch Configuration Using CLI Commands Network Expansion Module NEM OptionSecure Networks Policy Support Lanview Diagnostic LEDsStandards Compatibility Lanview Diagnostic LEDs Introduction Link Aggregation Network Requirements1000BASE-SX/LX/ELX Network 10BASE-T Network100BASE-TX Network 1000BASE-T NetworkInstallation Installing Module into Matrix E7 or N7 Chassis Installing Optional Network Expansion ModulesUnpacking the DFE-Platinum Module Preparation InstallationCard guides Installing Module into Matrix N1, N3, or N5 Chassis Connecting UTP Cables Connecting to the NetworkConnecting a Twisted Pair Segment to the DFE-Platinum Module RX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 What Is Needed Connecting to COM Port for Local ManagementConnecting to an IBM PC or Compatible Device Connecting an IBM PC or Compatible Connecting to a VT Series TerminalConnecting a VT Series Terminal Connecting to a ModemDB9 Adapter Wiring and Signal AssignmentsModem Port Adapter Wiring and Signal Diagram First-Time Log-In Using a Console Port Connection Completing the Installation of a New System11 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User AccountViewing the Receive and Transmit Activity TroubleshootingUsing Lanview About the Management Mgmt LEDLED Alternating 67% on, 33% off Series Configuration Guide for proper setup Troubleshooting ChecklistOverview of DFE-Platinum Module Shutdown Procedure Recommended Shutdown Procedure DFE-Platinum Module Specifications SpecificationsRegulatory Compliance COM Port Pinout AssignmentsSetting the Mode Switches Mode Switch Bank Settings Optional InstallationsRequired Tools Figure B-1 Mode Switch Location on 2G4082-25 Memory Locations and Replacement ProceduresLocation of Memory Modules Flash Dimm Replacement ProcedureRemoving the Dimm from 2G4082-25 Figure B-3 NEM Removal and Dimm Connector Location Dimm Installing the DimmInstalling the Dram Simm Dram Simm Replacement ProcedureRemoving the Dram Simm Figure B-7 Installing the Dram Simm Page Numerics IndexIndex-2