Enterasys Networks 9034310-01, 2G4082-25 manual Electromagnetic Compatibility EMC

Page 5

Electromagnetic Compatibility (EMC)

This product complies with the following: 47 CFR Parts 2 and 15, CSA C108.8, 2004/108/EC, EN 55022, EN 61000‐3‐2, EN 61000‐3‐3, EN 55024, AS/NZS CISPR 22, VCCI V‐3.

Compatibilidad Electromágnetica (EMC)

Este producto de Enterasys cumple con lo siguiente: 47 CFR Partes 2 y 15, CSA C108.8, 2004/108/EC, EN 55022, EN 55024, EN 61000‐3‐2, EN 61000‐3‐3, AS/NZS CISPR 22, VCCI V‐3.

Elektro- magnetische Kompatibilität ( EMC )

Dieses Produkt entspricht den folgenden Richtlinien: 47 CFR Parts 2 and 15, CSA C108.8, 2004/108/EC, EN 55022, EN 61000‐3‐2, EN 61000‐3‐3, EN 55024, AS/NZS CISPR 22, VCCI V‐3.

Hazardous Substances

This product complies with the requirements of European Directive, 2002/95/EC, Restriction of Hazardous Substances (RoHS) in Electrical and Electronic Equipment.

European Waste Electrical and Electronic Equipment (WEEE) Notice

In accordance with Directive 2002/96/EC of the European Parliament on waste electrical and electronic equipment (WEEE):

1.The symbol above indicates that separate collection of electrical and electronic equipment is required and that this product was placed on the European market after August 13, 2005, the date of enforcement for Directive 2002/96/EC.

2.When this product has reached the end of its serviceable life, it cannot be disposed of as unsorted municipal waste. It must be collected and treated separately.

3.It has been determined by the European Parliament that there are potential negative effects on the environment and human health as a result of the presence of hazardous substances in electrical and electronic equipment.

4.It is the users’ responsibility to utilize the available collection system to ensure WEEE is properly treated.

For information about the available collection system, please go to www.enterasys.com/support/ or contact Enterasys Customer Support at 353 61 705586 (Ireland).

iii

Image 5 Contents
Enterasys Matrix Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Supplement to Product Instructions Vcci Notice Enterasys NETWORKS, INC. Firmware License Agreement Vii Viii Contents Tables Appendix a SpecificationsIndex Important Notice About This GuideWho Should Use This Guide Related Documents How to Use This GuideGetting Help Conventions Used in This GuideGetting Help Overview of DFE Series Capabilities Introduction2G4082-25 DFE-Platinum ModuleDFE Switch Configuration Using CLI Commands Switch Configuration Using WebViewNetwork Expansion Module NEM Option ConnectivityStandards Compatibility Lanview Diagnostic LEDsSecure Networks Policy Support Lanview Diagnostic LEDs Introduction Link Aggregation Network Requirements100BASE-TX Network 10BASE-T Network1000BASE-T Network 1000BASE-SX/LX/ELX NetworkInstallation Unpacking the DFE-Platinum Module Installing Optional Network Expansion ModulesInstalling Module into Matrix E7 or N7 Chassis Preparation InstallationCard guides Installing Module into Matrix N1, N3, or N5 Chassis Connecting UTP Cables Connecting to the NetworkConnecting a Twisted Pair Segment to the DFE-Platinum Module RX+ TX1+ RX1 TX2+ TX3+ RX3 RX2 TX4+ RX4 Connecting to an IBM PC or Compatible Device Connecting to COM Port for Local ManagementWhat Is Needed Connecting an IBM PC or Compatible Connecting to a VT Series TerminalConnecting a VT Series Terminal Connecting to a ModemDB9 Adapter Wiring and Signal AssignmentsModem Port Adapter Wiring and Signal Diagram First-Time Log-In Using a Console Port Connection Completing the Installation of a New System11 Matrix DFE Startup Screen Example N7 Chassis Logging in with an Administratively-Configured User AccountUsing Lanview TroubleshootingAbout the Management Mgmt LED Viewing the Receive and Transmit ActivityLED Alternating 67% on, 33% off Series Configuration Guide for proper setup Troubleshooting ChecklistOverview of DFE-Platinum Module Shutdown Procedure Recommended Shutdown Procedure DFE-Platinum Module Specifications SpecificationsRegulatory Compliance COM Port Pinout AssignmentsRequired Tools Mode Switch Bank Settings Optional InstallationsSetting the Mode Switches Figure B-1 Mode Switch Location on 2G4082-25 Memory Locations and Replacement ProceduresRemoving the Dimm from 2G4082-25 Flash Dimm Replacement ProcedureLocation of Memory Modules Figure B-3 NEM Removal and Dimm Connector Location Dimm Installing the DimmRemoving the Dram Simm Dram Simm Replacement ProcedureInstalling the Dram Simm Figure B-7 Installing the Dram Simm Page Numerics IndexIndex-2
Related manuals
Manual 58 pages 25.55 Kb