INSTALLATION
Figure 4 — A Typical Installation Diagram for Transfer Switch
To Utility Power
Utility
Connection
Generator
Connection
Ground
Terminal
CT 2
CT 1
To Generator
NOTE: Models 071010 and 071011 have a utility disconnect circuit breaker built into the transfer switch enclosure.
Supervisory
Contacts
Load
Connection
Wireways
Neutral
Terminal
|
| Main Distribution Panel |
|
| Main |
Neutral | ||
Bus |
|
|
|
|
|
Ground Bus
System Setup
You must perform the following before operating the system:
•Place the 2 position sliding switch on the control module in the NG or LP position (Figure 7), whichever is appropriate for your system.
•Place the 3 position sliding switch on the control module to match the KW rating of the Home Standby Generator set (Figure 7).
Figure 7 — Control Module
2 Position |
Switch |
3 Position |
Switch |