Graco 24B591, 24B596 Third At Power Up, immediately go to Pump on normal on time

Page 23

Second: At Power Up, a delay occurs, the pump is off; then the normal lube cycle that was in process when power was removed, is resumed.

FIG. 36

1.Use the Arrow keys to move the cursor over the POWER UP pull-down menu.

2.From the pull-down menu, select OFF.

3.Press ENTER.

4.Use the Arrow keys to move the cursor over the DELAY pull-down menu.

5.From the pull-down menu, select ON.

6.Press ENTER.

7.Use the Arrow keys to move the cursor over the DELAY TIME field.

8.Press ENTER.

NOTE: Time is displayed in MM:SS.

9.Use the UP/DOWN arrows to move up and down through the numbers 0-9 until the first number in the DELAY TIME is displayed in the field.

10.Use the RIGHT arrow to move the cursor to the next field. Repeat step 9.

11.Repeat steps 9 and 10 until the desired time is dis- played.

12.Press RESET. The Main Screen, page 18 displays.

Setup

Third: At Power Up, immediately go to PUMP ON (normal on time)..

FIG. 37

1.Use the Arrow keys to move the cursor over the POWER UP pull-down menu.

2.From the pull-down menu, select ON.

3.Press ENTER.

4.Use the Arrow keys to move the cursor over the DELAY pull-down menu.

5.From the pull-down menu, select OFF.

6.Press RESET. The Main Screen, page 18 displays.

Fourth: At Power Up, go to programmed PUMP OFF delay time; then to normal PUMP ON.

FIG. 38

1.Use the Arrow keys to move the cursor over the POWER UP pull-down menu.

2.From the pull-down menu, select ON.

3.Press ENTER.

4.Use the Arrow keys to move the cursor over the DELAY pull-down menu.

313855H

23

Image 23
Contents GLC Lubrication Controller Important Safety InstructionsElectric Shock Hazard Direction Arrows Run Mode FunctionsComponent Identification Keypad, Display, and IconsIcons Typical Installation InstallationGrounding Installing the Lubrication ControllerOptional I/O Wiring Diagrams System Configuration and WiringSystem Configurations Modes of Operation Sensor Wiring ConfigurationsDivider Valve System System ConfigurationDual Line System Injector System Source Switch 2 or 3 Wire Type System WiringInput Sensor Wiring 30VDC Pump on = Time Pump OFF = TimePump on = Cycle or Pressure Pump OFF = Time Dry Contact, shown. For other configuration, see or FIGPump on = Cycle or Pressure Pump OFF = Machine Count System Wiring Options 100/240VAC System Wiring Options Alarm Out30VDC See Electric Connection Warning, SetupSystem Setup PIN Mode Enabled Main Screen System SetupPump on Setup Timer SetupCycle END Setup Pressure SetupTo Set the Pump OFF Option Pump OFF SetupCycle Mode Selection If Both is selected If Time is selectedIf Count is selected Power Up can be programmed one of four ways Power UP SetupThird At Power Up, immediately go to Pump on normal on time Pulsed Pump Screen Pulsed SetupTo enable PIN Code Entry PIN SetupDisplay Backlight Display SetupQuick Cycle Setup Quick Cycle Screen Setup LOW Level Filtering SetupLow Level Filtering Screen Setup Screen Identification Run ModePump On Ended with Time Prelube Power UpPump On Ended with Pressure Pump Off Ended with Machine Counts Pump On Ended with Cycle Switch ActivationPump Off Ended with Time Pump Off Ended with Machine Counts Max Time Entered Alarms ScreenModes of Operation TroubleshootingProgram Settings Description Problem SolutionIP69K Technical DataMounting Hole Layout DimensionsGraco Information Graco Standard Warranty