2. Installation
2.4 Installation in rack position
Adjustment of the orientation of the logo and control panel
1
2
3
UPS module rack mounting (optional rails required)
Pulsar MX RT is very heavy. To ease its rack integration, we strongly recommend to remove the battery tray as shown below:
2
|
| 4 |
3 | 3 | 1 |
| ||
|
| 1 |
x 6
1
1 - Remove the 6 fixing screws to free the main front panel bezel.
2 - Place the front panel above the UPS.
3 - Remove the 4 fixing screws on the right side to free the battery