MGE UPS Systems 4000 RT user manual Contents

Page 5

Contents

1.Presentation

1.1

Standard positions

7

 

Tower position

7

 

Rack position

7

1.2

Rear panels

8

 

Pulsar MX 4000 RT / 5000 RT

8

 

Pulsar MX EXB RT (optional battery module)

8

1.3

Display and control panel

9

1.4

Options

9

 

Rack mounting kit

9

 

ModularEasy MX

10

 

Battery extensions for UPS backup times up to 80 minutes

11

 

Battery Integration System

11

 

Battery extension cable

11

2.Installation

2.1

Unpacking and contents check

12

2.2

Internal batteries connection (Battery start-up)

12

2.3

Installation in tower position

13

2.4

Installation in rack position

14

 

Adjustment of the orientation of the logo and control panel

14

 

UPS module rack mounting

14

 

UPS or battery module rack mounting

15

2.5

Communication ports

16

 

Connection to the RS232 communication port

16

 

Connection to the communication port by relays

16

 

Remote Power Off communication port

17

 

Installation of communication cards

17

2.6

Required protective devices and cable cross-sections

18

 

Recommended upstream protection

18

 

Recommended downstream protection

18

 

Required cable cross-sections

18

2.7

Connection of input/output power cables to UPS terminals

19

2.8

Connection of IEC cables to output receptacles

20

3.Operation

3.1

Initial start-up

21

3.2

Final start-up sequence

21

3.3

Operating modes

22

3.4

Operation on battery power

23

3.5

Return on Normal AC source

23

3.6

UPS shutdown

24

4.Access to measurements and personalisation data

4.1

Display organisation

25

4.2

Access to measurements

25

4.3

Access to UPS set-up and maintenance using the control panel

25

4.4

UPS set-up

26

4.5

Maintenance

27

4.6

Personalisation using external software

27

34008030EN/AA - Page 5

Image 5
Contents Pulsar MX 34008030EN/AA Environmental protection IntroductionSubstances PackingPictograms Contents Technical specifications Glossary TroubleshootingPresentation Dimensions H x W x D in mm / InchesStandard positions Tower position Rack positionPulsar MX 4000 RT / 5000 RT Pulsar MX EXB RT optional battery moduleRear panels Options Display and control panelRack mounting kit Telescopic rails, 639 mm to 1005 mmPulsar MX RT ModularEasyPulsar MX RT Pulsar MX RT ModularEasy Battery extension cable 1,8 m / 6 ft Battery Integration SystemBattery extensions for Pulsar MX RT Pulsar MX EXB RT Pulsar MX 4000 RT Min 29 min 53 minInternal battery connection Battery start-up InstallationUnpacking and contents check Installation in tower position Installation in rack position UPS or battery module rack mounting optional rails required Connection to the communication port by relays Communication portsConnection to the RS 232 communication port Remote power off contact normally closed Remote Power Off communication portRemote power off contact normally open Recommended upstream protection Required protective devices and cable cross-sectionsRecommended downstream protection Required cable cross-sectionsAlways connect first the earthing wire Connection of input/output power cables on UPS terminalsConnection of IEC cables to output receptacles Initial start-up OperationFinal start-up sequence UPS personalisationEco mode Normal modeEquipments are supplied in ECO mode Operating modesTransfer to battery power Operation on battery powerLow battery warning End of backup timePress the 0 button 28 more than 3s UPS shutdownAccess to measurements Access to measurements and personalisation dataMaintenance menu Display organisationOutput settings Local settingsON/OFF settings UPS set-upBattery settings MaintenancePersonalisation using external software Troubleshooting Leds 21 TroubleshootingBut the operation is downgraded By the UPSDisplay Signification Correction Indication Diagnostic CorrectionLife Cycle Monitoring LCM Secure your installation power continuityDescription Get free offersReset or disable LCM Hot swapping the battery sub-module MaintenanceHot swapping the power sub-module Maintenance Reconnecting the battery sub-moduleReturn to normal operation Test positionHz training centre Training centreAppendices Technical specificationsGlossary 34008030EN/AA 34008030EN/AA