2. Installation
Remote Power Off communication port (16)
(see page 8)
Installation of a Remote Power Off function must be carried out in compliance with applicable regulations.
In order to fully
◗to use a
◗to connect to this RPO switch a device that allows to trip all breaker(s) located upstream(1) and downstream(2) Pulsar MX RT. This can be achieved by means of a shunt trip.
(1): If not, the output devices could be powered again through static switch when the
(2): If not, the output devices will remain powered several seconds after the RPO activation.
Please, notice that the internal batteries will remain connected to the power
The cable is not included.
Remote power off contact normally open
RJ12 (6p6c)
6 5 4 3 2 1
5 V DC to 27 V DC
◗Signal:
-activation voltage: 5 V DC to 27 V DC.
-current: 10 mA max.
Remote power off contact normally closed
RJ12 (6p6c)
6 5 4 3 2 1
5 V DC to 27 V DC
Installation of communication cards (optional, standard with the NetPack version)
SWITCHED |
GROUP 2 |
SWITCHED |
GROUP 1 |
It is not necessary to shutdown the UPS before installing a communications card.
1 - Remove the slot cover secured by two screws.
2 - Insert the communications card in the slot.
3 - Secure the card with both screws.
PARALLEL
IP=
MAC=00E0D8FF855E
Reset
1 2 ON
RS232 Download
100 | 10 | UPS |
|
| data |
ETHERNET |
|
Card Settings
RS232 66074
Communication card (restricted access)
RS232 CONTACTS BAT NO. RPO