APC
Power Supply
manual
InfraStruXure Installation and Start-Up
Specs
Install
Dimension
Configuration
Start-Up Procedure
Weight
How to
Safety
Ensure Total Power Off
Page 1
InfraStruXure™
Installation and
Start-Up
Large Data Centers
415 and 200V Input
Page 1
Page 2
Image 1
Page 1
Page 2
Contents
InfraStruXure Installation and Start-Up
This manual is available in English on the enclosed CD
About this Manual
Page
Contents
Start-Up Procedure
Configuration
Page
Safety symbols used in this manual
Safety
Cross-reference symbols used in this manual
Overview
Total power off procedure
Installation/Maintenance
Input Voltage Circuit Breaker Size
Register equipment with the fire department
Site Preparation
Dimensions
InfraStruXure PDU
NetShelter VX Seismic Enclosure
NetShelter VX Enclosure
Space Considerations
Component Maximum Unpacked Maximum Packaged
Weight Considerations
InfraStruXure PDU Heat Output
Heat Output
Procedures requiring a licensed electrician
Electrical Requirements and Specifications
Electrical requirements
200V Input 415V Input
Basic Installation Procedure
Licensed electrician must connect the power source
Join Adjacent Enclosures and Bolt Enclosures to the Floor
Installation Procedures
Join adjacent enclosures
Bolt Enclosures to the Floor
Ensure Total Power Off
Access the PDU Main Input switch
Connect the Power Source to the PDU
Attach conduit to the PDU for the input conductors
Installation Procedures Connect the Power Source to the PDU
Route the input conductors to the main input circuit switch
Install a circuit breaker
Torque specifications and tools required
Terminal Torque Tools
Connect input conductors
Overview
Output relay specifications
How to connect contacts to the PDU Monitoring Unit
InfraStruXure Site Planning, Installation, Start-Up
Cable Ladders for overhead wiring across rows
Install the Rack Automatic Transfer Switches ATS
Install InfraStruXure Rack-Mount Devices
Install the Rack Power Distribution Units PDU
Install the InfraStruXure Manager and Hub or Switch
Route and attach power cables to equipment racks
Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Wiring Under the Floor Alternative
Installation Procedures Wiring Under the Floor Alternative
Connect network cables to InfraStruXure components
Route Data Cables to the InfraStruXure Manager Hub or Switch
Overhead routing
Safety warnings
Start-Up Procedure
Ensure that all power is off
Apply power to the system
Start-Up Procedure InfraStruXure System
Page
Configure the InfraStruXure Manager
Configuration
Page
Appendix A-System Operation
How to Apply Power to the System
How to Ensure Total Power Off
Page
APC Worldwide Customer Support
Related pages
All Install page
Reinstall the capture stage Lower the camera arm for HP TopShot CF040ARBGJ
Installation Guide Guía de instalación Manual de Instalação for Bosch Appliances FPE-1000-CITY
Installing an Add-in Board for Intel MB440LX
Installation Before Operation for Homelite HG1800
INSTALLATION-STATION Apparatus for Toshiba DK8
Installing on a wall for Samsung VL351/XE
Reinstalling Software for Dell D520
Installation for Marquis EUROMW5
Installation Instructions for NuTone 8663RP
Uninstallation for Ratoc Systems CFU2
What sample frequencies are supported by
VBrick 4000 models
?
Top
Page
Image
Contents