Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
If you ordered overhead wiring, connect the prewired power cables of the PDU as follows:
1.Install the Shielding Troughs, Shielding Partitions, and Cable Ladders so that you can route power cables from the PDU to the NetShelter VX Enclosures.
For installation instructions, see the manual included with your Shielding
Troughs, Shielding Partitions, and Cable Ladders.
See also
2.Find the numbers that indicate the enclosure to which each power cable will supply power. These numbers appear on the roof of the PDU where the power cables exit, and on the ends of each power cable.
The enclosures are not numbered. Consult your APC InfraStruXure Configure-
3.Beginning with the power cables for the enclosures farthest from the PDU, run each power cable within the Shielding Trough along the row and, if necessary, across one or more Cable Ladders to the enclosure to which it will provide power.
Ensure that the connector at the end of each power cable always lies on top of any longer power cables in the Shielding Trough.
4.Connect the appropriate power cable to APC power management equipment in the enclosure in one of the four following ways:
–For
22 | InfraStruXure Site Planning, Installation, |